1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
atroni [7]
3 years ago
5

PLEASE HELP ME ITS DUE REALLY SOON PLZZZZ

Mathematics
1 answer:
Yuliya22 [10]3 years ago
4 0

Answer:

1) 5x + 4x²(2x + 7) - 6x² - 9x

= 5x + 8x³ + 28x² - 6x² - 9x

= 8x³ + 22x² - 4x

2) the answer is 2x³ + 17x² + 25x - 50

3) the answer is y = 4x² + 14x + 18

You might be interested in
Suppose that your business is operating at the 4.5-Sigma quality level. If projects have an average improvement rate of 50% annu
Luda [366]

Answer:

  11.75 years

Step-by-step explanation:

If we ignore the fact that "6-sigma" quality means the error rate corresponds to about -4.5σ (3.4 ppm) and simply go with ...

  P(z ≤ -6) ≈ 9.86588×10^-10

and

  P(z ≤ -4.5) ≈ 3.39767×10^-6

the ratio of these error rates is about 0.000290372. We're multiplying the error rate by 0.5 each year, so we want to find the power of 0.50 that gives this value:

  0.50^t = 0.000290372

  t·log(0.50) = log(0.00290372) . . . . take logarithms

  t = log(0.000290372)/log(0.50) ≈ -3.537045/-0.301030

  t ≈ 11.75

It will take about 11.75 years to achieve Six Sigma quality (0.99 ppb error rate).

_____

<em>Comment on Six Sigma</em>

A 3.4 ppm error rate is customarily associated with "Six Sigma" quality. It assumes that the process may have an offset from the mean of up to 1.5 sigma, so the "six sigma" error rate is P(z ≤ (1.5 -6)) = P(z ≤ -4.5) ≈ 3.4·10^-6.

Using that same criteria for the "4.5-Sigma" quality level, we find that error rate to be P(z ≤ (1.5 -4.5)) = P(z ≤ -3) ≈ 1.35·10^-3.

Then the improvement ratio needs to be only 0.00251699, and it will take only about ...

  t ≈ log(0.00251699)/log(0.5) ≈ 8.6 . . . . years

5 0
3 years ago
Question 9 of 10
Aleks04 [339]

Answer:

A is the answer

// x = -2(y + 3)2-1

4 0
2 years ago
A worker is being raised in a bucket lift at a constant speed of 3 ft/s. When the worker's arms are 10 ft off the ground, her co
sweet [91]
H=3t+10 and h=-16t+15t+6

They will never be at the same height at the same time
7 0
3 years ago
Read 2 more answers
Is 95.045 greater than less than or <br> equal two 95.545
LekaFEV [45]
Less then.. The first two numbers before the decimal are the same 95.  After the decimal is where you'll see the change. Your first number is .045 and the second one is .545.. "0," is less than "5."
8 0
3 years ago
4444444444444444444444444444444444
Debora [2.8K]
The second one is the correct equation. The constant to the right should be the diameter squared, while the numbers inside the parentheses should be the opposite. 
5 0
3 years ago
Read 2 more answers
Other questions:
  • How do you solve -6(a+8)
    10·2 answers
  • A square park has an area of 1⁄16 square miles and a length of 1⁄4 mile. What is the width of the park?
    13·1 answer
  • Sandra wants to evaluate 2 cot Her work is shown below. What did she do wrong?
    7·1 answer
  • The equation of a line is given below.
    7·2 answers
  • A bedroom is 10 ft by 12 how much does it cost to wallpaper this room if the wallpaper costs 1.53 per ft?
    5·1 answer
  • A bag contains 5 black, 3 green, 3 blue, and 4 yellow marbles. A marble is randomly drawn. Find P(not black). 4/15 1/5 1/3 2/3
    6·1 answer
  • Alex buys a top of the line computer. He did not realize that the computer would lose value so fast. If his computer cost $1800.
    8·1 answer
  • 3 (b-8)=18 what does b equal
    7·2 answers
  • URGENT PLEASE !!!! Please answer correctly !!Will mark Brianliest !!!!!!!!!!
    6·1 answer
  • The volume of a square pyramid with a height of 12m is 100 m find the Length of the square base.
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!