1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
allsm [11]
3 years ago
11

Question 3 (2 points)

Mathematics
1 answer:
diamong [38]3 years ago
6 0

Answer:

I'm sorry but I have no idea

You might be interested in
In 2014, the population of Hong Kong was estimated to be approximately 7,112,688 people. The city covers an area of approximatel
ratelena [41]
We know that

Population density<span> is a measurement of population per unit area
</span>[population density]=population/area-----><span>7,112,688/426.25----> 16686.66
16686.66----------> 16687 person/square mile

the answer is
</span>16687 person/square mile
8 0
4 years ago
Veena's recipe for bran muffins calls for 2.25 mL of vanilla extract.
diamong [38]

Answer:

2.25x4.7=10.575

Multiply the amount required for one batch by the # of batches

Step-by-step explanation:

7 0
3 years ago
Read 2 more answers
Jeremy has two pieces of what one is 90 inches and the other is 72 inches he want to cut the pieces of wood in the smaller piece
shusha [124]
The gcf of 90 and 72 is 18, so i divided both of them by 18 and i got 4 and 5, in total he would 9 pieces of wood
5 0
4 years ago
Tom can do a job in 4 hours while Sam can do it in 6 hours. How many hours would it take to complete this job if they work toget
Hunter-Best [27]

Answer:

12/5hours=2.4 hours

Step-by-step explanation:

Sam:6hours

Tom:4hours

This is a rate problem

Sam's rate is one job completed in 6 hours which is 1/6

Tom's rate is one job completed in 4 hours which is 1/4

Together, they could complete 1/4+1/6 of the job in y hours

We are trying to find the rate at which Sam and Tom could complete the job together, or one job in x days, for a rate of 1/y

1/4+1/6=1/y

The least common denominator is 12y

Multiplying through by the LCD which gives:

12y(1/4)+ 12y (1/6)= 12y (1/y)

3y + 2y=12

5y = 12

y=12/5 hours=2.4hours

Therefore it will take 12/5 hours or 2.4 hours to complete the job if they work together

4 0
3 years ago
Find the area of athletic field if it's length is 120cm and its width is 28cm .A. 397.6cm B. 3360cm C. 296 cm D. 4592cm E. 3356c
Naddika [18.5K]

Answer:

B 3360

Step-by-step explanation:

Area of Rectangle = Length X Width

120 X 28

= 3360 cm

Answered by Gauthmath

6 0
3 years ago
Read 2 more answers
Other questions:
  • Solve this system:<br><br> 2x+5y+z=3<br> x-3y+2z=2<br> -x+2y-3z=-7
    5·1 answer
  • 3/4<br> is it equivalent to<br> 5/6
    7·1 answer
  • The work in an office takes 150 hours to complete every week each person in the group does work for 32 hours.
    11·1 answer
  • Maths hw???????please help^^^^^^^^
    6·1 answer
  • I don’t understand the problem please help
    13·1 answer
  • Jermain made 6 candles. lukas made 4 times as many candles as jermain did. they plan to pack the candles in boxes with 3 candles
    12·2 answers
  • Determine the slope and y-intercept for the line that passes through the points (5, 5) and (−5, 1)
    14·1 answer
  • 50 POINTS: Please help thank you so much!! (Image attached) The polygons are similar. Find the values of the variables.
    8·1 answer
  • The ratio : y is 3:1
    13·1 answer
  • What are the coordinates of the image of vertex G after
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!