<h3><u>Answer</u>:- </h3>

<h3><u>Solution:-</u></h3>
<u>Given </u><u>that </u><u>:</u><u>-</u>
- job last for h hours
- Cost of job lasting more than 1 hour = $30
- Cost for the first hour = $75
Remaining hours for which the job will last after first hour= (h-1)
<u>Therefore</u>,
Cost for subsequent hours = 30×(h-1)
= 30(h-1)
Total Cost for job = Cost for 1st hour + Cost for subsequent hours

<h2>
Answer:</h2>
The answer is 16.
<h2>
Step-by-step explanation:</h2>
Since the 8x is positive, the equation must have y as a positive number.
Let's see this!
An easy way to complete the square if you have the constants for x2 and
But not the non-variable number is to divide the x constant, and then square it.
Example:

The last number must be 16. Let's check it.

Answer:
It's 16 units. Just look at the lengths and how many times they are on a shape. The shape is a rectangle, which means there will be two of each length, so just add them all together. 6+6+2+2=16
Answer:
He payed $643.50 for the bike
Step-by-step explanation:
Because $585 + 10% = $643.50
(Sorry if wrong!)
<BOA = 360 -250 = 110
<<span>BDA = 110/2 = 55
<</span><span>BCA = 360 - (90+90+110)
</span><<span>BCA = 360 - 290
<</span><span>BCA = 70</span>