Answer:234972356463269+32+33126362563
Step-by-step explanation:720
24
+
740
32
760
40
D
+
780
48
800
56
=
252654646359
Depends on the prism!
Here are the basic ones:
SA of rectangular prism = 2lw + 2wh + 2lh OR 2(lw+wh+lh)
SA of triangular prism = 2*area of base + perimeter of base*height
Answer:
The total cost for 8 hours of work is $425.
The total cost for 10 hours of work is $525.
The total amount the plumber earns is made up of a fixed charge and a variable charge. A fixed charge is a charge that remains constant regardless of the number of hours the plumber works. The fixed charge is $25. The variable charge is the charge that increases per hours worked. The variable charge is $50 per hour.
Cost = fixed charge + variable charge
C = $25 + $50h
The total cost for 8 hours
$25 + $50(8)
$25 + $400
= $425.
The total cost for 10 hours
$25 + $50(10)
$25 + $500
$525.
Step-by-step explanation:
hope this helps
Divide 80/3 which equals 26.6. So it take Courtney 26.6 minutes to walk 1 mile. Then divide 110/26.6 which equals 4.1.
Courtney walls 4.1 miles in 110 minutes.
Answer:
The correct answer is (b).
Step-by-step explanation:
A line is parallel to the
axis if it has a slope equal zero. Then if we compute the slope of the line that joins the points
then

This implies that the line which that joins this points is parallel to the x-axis.
Observe that the slopes of the lines corresponding to the other items are nonzero.