1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Andrej [43]
3 years ago
7

Can somebody who knows how to do probability help answer these questions correctly thanks sm! (Also the P=probability)

Mathematics
2 answers:
seraphim [82]3 years ago
6 0

Answer:

8) 1/4

9) 1/4

10) 1/8

11) 3/8

Here are the correct answers :)

yKpoI14uk [10]3 years ago
5 0

Answer:

P(2): 1/4

P(1): 1/4

P(4): 1/8

P(3 or 5): 3/8

Step-by-step explanation:

The areas marked 1, 2, and 3 each take up 1/4 of the box. This means that the probability that you will spin the arrow and land in any of those spaces is 1/4 each.

Areas 4 and 5 are HALF the size of areas 1, 2, and 3. This means that areas 4 and 5 are half of 1/4. Half of 1/4 is 1/8.

The word "or" means that you ADD whatever two probabilities they are asking for. In this case, you add areas 3 and 5. So, add 1/4 + 1/8 = 3/8.

(an easy way to add 1/4 to 1/8 is to change 1/4 to 2/8. Then you can add the two areas easily)

You might be interested in
Rita has 10 centimeters of
astra-53 [7]

Answer: 1.25

Step-by-step explanation:

because it is

6 0
3 years ago
Round these number to the nearest whole number:<br> 3.7<br> 8.5 <br> 36.4<br> 6.54
lukranit [14]

Answer:

4

9

36

7

Step-by-step explanation:

Just know that if the number after another is greater than 5 you add to it but if lesser than...you leave it like that

7 0
3 years ago
A company manufactures two different sizes of boat lifts. The smaller lift requires 1 hour in the welding department and 2 hours
qaws [65]

Answer:

  • The solution that optimizes the profit is producing 0 small lifts and 50 large lifts.
  • Below are all the steps explained in detail.
  • The graph is attached.

Explanation:

<u />

<u>1. Name the variables:</u>

  • x: number of smaller lifts
  • y: number of larger lifts

<u></u>

<u>2.  Build a table to determine the number of hours each lift requires from each department:</u>

<u></u>

Number of hours

                                        small lift    large lift   total per department

Welding department            1x             3y                x + 3y

Packaging department        2x             1y                2x + y

<u></u>

<u>3. Constraints</u>

  • 150 hours available in welding:         x + 3y ≤ 150
  • 120 hours available in packaging:   2x + y ≤ 120
  • The variables cannot be negative:    x ≥ 0, and y ≥ 0

Then you must:

  • draw the lines and regions defined by each constraint
  • determine the region of solution that satisfies all the constraints
  • determine the vertices of the solution region
  • test the profit function for each of the vertices. The vertex that gives the greatest profit is the solution (the number of each tupe that should be produced to maximize profits)

<u></u>

<u>4. Graph</u>

See the graph attached.

Here is how you draw it.

  • x + 3y ≤ 150
  • draw the line x + 3y = 150 (a solid line because it is included in the solution set)
  • shade the region below and to the left of the line

  • 2x + y ≤ 120
  • draw the line 2x + y ≤ 120 (a solid line because it is included in the solution set)
  • shade the region below and to the left of the line

  • x ≥ 0 and y ≥ 0: means that only the first quadrant is considered

  • the solution region is the intersection of the regions described above.

  • take the points that are vertices inside the solutoin region.

<u>5. Test the profit function for each vertex</u>

The profit function is P(x,y) = 25x + 90y

The vertices shown in the graph are:

  • (0,0)
  • (0,50)
  • (42,36)
  • (60,0)

The profits with the vertices are:

  • P(0,0) = 0
  • P(0,50) = 25(0) + 90(50) = 4,500
  • P(42,36) = 25(42) + 90(36) = 4,290
  • P(60,0) = 25(60) + 90(0) = 1,500

Thus, the solution that optimizes the profit is producing 0 smaller lifts and 90 larger lifts.

3 0
3 years ago
What is the largest perfect square that would be a factor when simplifying √48?
marshall27 [118]
Im debating between b. and c. but I'd go more with C.
6 0
4 years ago
Yep sorry again this math is hard
kramer

Answer:

<

Step-by-step explanation:

Firstly, you can focus on the scientific notation and calculate which one is bigger. The left side is 10^3 whereas the right side is 10^4. This shows that even if the number before this was bigger, the larger exponent of these two are the bigger number.

10^3 = 1000\\10^4 = 10000

Meaning the correct sign would be the smaller than sign (<) as the right side is bigger than the left.

Hope this helps!

8 0
3 years ago
Other questions:
  • If 60 is 75% of a value,what is that value
    11·2 answers
  • Help please asap!!!
    6·1 answer
  • An archway is modeled by the equation y = -2x2 + 8x. A rod is to be placed across the archway at an angle defined by the equatio
    15·1 answer
  • I need help with number 18 please!
    9·2 answers
  • In a 6th grade Math calss, 4 students were finding the GCF of 24 , 40, and 72. Omar said that the GFC is 4. Brendan said that th
    10·1 answer
  • A café used 640 ounces of water to make tea. How many quarts of water did the café use PLEASE PLEASE PLEASE SHOW YOUR WORK
    8·1 answer
  • Pls help me with this math question pls​
    6·1 answer
  • Calculate the distance between the points E=(-6,8) and N=(-1,5) in the coordinate plane. Give an exact answer (not a decimal app
    8·1 answer
  • A​ new, simple test has been developed to detect a particular type of cancer. The test must be evaluated before it is put into u
    12·1 answer
  • Evaluating an exponential function
    10·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!