Answer:
4.63 cubic yard.
Step-by-step explanation:
Given,
The length of sidewalk, l = 100 feet,
Width, w = 5 feet,
Depth, h = 3 inches = 0.25 feet,
Thus, the volume of the concrete needed for making the sidewalk,


= 125 cubic feet,
∵ 1 cubic yard = 27 cubic feet,
⇒ 1 cubic feet =
cubic yard,
Thus, the quantity of concrete needed =
≈ 4.63 cubic yard.
Answer:
25.047 or roughly 25.
Step-by-step explanation:
I solved it wrong the first time then i double check with wolframalpha and got the correct number.
We know that the area of the tile is 18
and it makes a triangle, we also know the base and height. In this case the base is 2
and the height is also given which is
.
Area of triangle =
,
substituting we will end up with 18
=( 2
*
) / 2
Here is the tricky part
, i totally forgot about that lol.
Simplifying: we will get 18
= 
Now, in order to find the x, we will need to take the log of both sides.

Solving for x we end up getting:
= x
where x = 25.047.
To be honest I deserve a nobel prize not a brainliest lol.
Good question bro, take it easy.
Answer:
172-602 I think
Step-by-step explanation: