Answer:
A = 25.758 m²
Step-by-step explanation:
Width of the sand pit, b = 2.7 m
Length of the sand pit, l = 9.54 m
We want to cover the sand pit with a piece of plastic. We need to find how many square meters of plastic will be needed to cover the sand pit. It is equal to the area of sand pit. It is in the shape of rectangle. Its area is given by :
A = l × b
A = 2.7 × 9.54
A = 25.758 m²
So, 25.758 m² of plastic will be needed to cover the sand pit.
Answer:
3/5
Step-by-step explanation:
12/20
(divide both by 2)
12/2= 6
20/2=10
6/10
(divide by both by 2)
6/2= 3
10/2= 5
3/5
<u>Let's take this problem step-by-step</u>:
<u>The ;unlabeled angle' adjacent to the 'outside angle of measure 78°'</u>
⇒ is on a straight line
⇒ sum of angle measure = 180 degrees

<u>Now we know:</u>
⇒ sum of all angles in a triangle ⇒ 180°
<u>Let's put that in equation form and solve:</u>

<u>Answer: 21°</u>
<u></u>
Hope that helps!
#LearnwithBrainly
Answer:
( $74.623, $83.777)
The 90% confidence interval is = ( $74.623, $83.777)
Critical value at 90% confidence = 1.645
Step-by-step explanation:
Confidence interval can be defined as a range of values so defined that there is a specified probability that the value of a parameter lies within it.
The confidence interval of a statistical data can be written as.
x+/-zr/√n
Given that;
Mean x = $79.20
Standard deviation r = $10.41
Number of samples n = 14
Confidence interval = 90%
Using the z table;
The critical value that should be used in constructing the confidence interval.
z(α=0.05) = 1.645
Critical value at 90% confidence z = 1.645
Substituting the values we have;
$79.20+/-1.645($10.42/√14)
$79.20+/-1.645($2.782189528308)
$79.20+/-$4.576701774067
$79.20+/-$4.577
( $74.623, $83.777)
The 90% confidence interval is = ( $74.623, $83.777)
Twice as long as little drop...