Slope equals rise over run. Rise is referring to y values and run is referring to X values. so if they say tests are the Y axis then you use 27 as the rise and 36 as the run. once you have the fraction it is simply reducing the fraction.
27/36= 9/12 = 3/4
Answer:
Sharika needs 2.5 days to finish the remaining work
Step-by-step explanation:
Sharika can do a work in 6 days palkey can do it in 8 days
Then the amount of work sharika can do in 1 day = 1/6
And the amount of work palkey can do in 1 day = 1/8
The amount of work both of them can do together in 1 day = 1/6 + 1/8
= 7/24
The amount of work both of them can do together in 2 day = (2× 7/24)
= 7/12
Since Palkey left the work,the amount of
work remaining for Sharika to do alone = (1 - 7/12 )
= 5/12
The number of days Sharika take to finish the remainig work. = (5/12 ÷ 1/6 )
= 5/2 days
Therefore, Sharika needs 2.5 days to finish the remaining work.
Answer:
0; 1/4; 1/2; 1.5; 1.75 and 1 and 3/4 are the same.
Step-by-step explanation:
Step-by-step explanation:
45% of number = 180
=> 100% of number = 180 * (100/45) = 400.
Hence the number is 400.