Answer:
The general plan is to find BM and from that CM. You need 2 equations to do that.
Step One
Set up the two equations.
(7 - BM)^2 + CM^2 = (4*sqrt(2) ) ^ 2 = 32
BM^2 + CM^2 = 5^2 = 25
Step Two
Subtract the two equations.
(7 - BM)^2 + CM^2 = 32
BM^2 + CM^2 = 25
(7 - BM)^2 - BM^2 = 7 (3)
Step three
Expand the left side of the new equation labeled (3)
49 - 14BM + BM^2 - BM^2 = 7
Step 4
Simplify And Solve
49 - 14BM = 7 Subtract 49 from both sides.
-49 - 14BM = 7 - 49
- 14BM = - 42 Divide by - 14
BM = -42 / - 14
BM = 3
Step Five
Find CM
CM^2 + BM^2 = 5^2
CM^2 + 3^2 = 5^2 Subtract 3^2 from both sides.
CM^2 = 25 - 9
CM^2 = 16 Take the square root of both sides.
sqrt(CM^2) = sqrt(16)
CM = 4 < Answer
Step-by-step explanation:
Answer:
6 divided by 3/5 is 10
Step-by-step explanation:
I don't know how to do the number line, sorry.
4 hours for 18
7 hours for 25.50
Difference in hours: 7-4 = 3
Difference in cost: 25.50 - 18 = 7.50
7.50 / 3 = 2.50
A. They charge 2.50 per hour.
B. 2.50 x 4 = 10
18 - 10 = 8
The flat fee is 8 dollars
C. 8 + (2 x 2.50) = 13 dollars
Answer:
less than, this is scaling dude
Step-by-step explanation:
The factors of 15 are 1, 3, 5 and 15. Now, as 1 is neither prime and nor a composite number (1 is not Prime because for a number to be a prime, it should have exact 2 factors i.e. 1 and itself, but 1 has only one factor. Therefore 1 is not prime.)
So the smallest prime factor of 15 is 3.
Hope this helped! :)