Around 8 hours and 20 minutes
Explanation:
I divided 500 by 60 and got 8.3333333333 and i round it up to 8.20, so it is 8 hours and 20 minutes.
Answer:
c. length of the wall or column and the rate of placement of the concrete
Explanation:
when designing for wall and column form-works, it is of utmost important to know the length of the wall and the type of concrete placement to be used.
Concrete placement has methods and precaution to be taken when doing the form work
if the concrete placement is manually (hand or funnel) the form work height should not be more than 1 m to enable easy compaction and vibration of concrete in the form.
Also, if the form work length is too long and it is not well reinforced, it tends to burg if the force apply during concrete placement or during vibration is much.
Answer:
A tensor is a quantity, for example a stress or a strain, which has magnitude, direction, and a plane in which it acts. Stress and strain are both tensor quantities. ... A tensor is a quantity, for example a stress or a strain, which has magnitude, direction, and a plane in which it acts.
Inertia Tensor. where I = the inertia tensor. The angular momentum of a rigid body rotating about an axis passing through the origin of the local reference frame is in fact the product of the inertia tensor of the object and the angular velocity. ... As shown in [7], the inertia tensor is symmetric.
Explanation:
Hope dis help
P waves<span> are produced by all earthquakes. They are compression </span>waves<span> that </span>form <span>when rocks break due to pressure in the Earth. S </span>waves<span> are secondary </span>waves<span> that are also created during an earthquake. They travel at a slower speed than the </span>p-waves<span>.
S waves are the waves that come after the earthquake and P waves
</span>