An easy way is to work out their speed. Speed = distance/time.
First part: Speed = 330/5.5 = 60 mph
Finally, the second part: time = distance / speed
So time = 720/60 = 12 hours
The third one down
Because the best line of fit is a line that goes between the plotted points and it HAS to be a straight line and most of the points close to the line
Answer:
2.21936352 feet
Step-by-step explanation:
420334*5280 (thats feet in a mile) divided by 1000000000
Answer:
Results are below.
Step-by-step explanation:
<u>First, we need to calculate the variable income per job:</u>
<u />
First job= 450 - 150= 300
Second job= 675 - 150= 525
<u>Now, the hourly rate:</u>
<u></u>
Hourly rate= total variable income / number of hours
First job= 300 / 4= $75
Second job= 525 / 3= $175
It is probably that the second job was 7 hours long. If not, he doesn't charge the same amount per hour