Answer:
Mean track length for this rock specimen is between 10.463 and 13.537
Step-by-step explanation:
99% confidence interval for the mean track length for rock specimen can be calculated using the formula:
M±
where
- M is the average track length (12 μm) in the report
- t is the two tailed t-score in 99% confidence interval (2.977)
- s is the standard deviation of track lengths in the report (2 μm)
- N is the total number of tracks (15)
putting these numbers in the formula, we get confidence interval in 99% confidence as:
12±
=12±1.537
Therefore, mean track length for this rock specimen is between 10.463 and 13.537
Answer:
= $44.19
Step-by-step explanation:
APR = 19%
Billing cycle = 30 days
Balance = $2830
Let's first find the daily rate,
Daily rate = 
The daily rate = 0.000521
To calculate the amount Shirley was charged interest for the billing cycle, we use:
Daily rate * billing cycle * balance
Where,
Daily rate
= 
Billing cycle = 30 days
Balance = $2830
Therefore, expression to be used =

50
there’s no way x is 360 or 140
4n-40=7(-2n+2)
4n-40=-14n+14
subtract -4n from both sides
-40 = -18n +14
subtract -14 from both sides
-54=-18n
divide both sides by -18
3 = n
Answer:
x=2i, -2i
Step-by-step explanation: