Answer:
occurs when the goal is challenging but not impossible.
Explanation:
A goal can be defined as the desire to meet specific targets over a period of time.
Generally, there are different types of goals and these includes;
1. Short-term goal: this type of goal are usually actualized (achieved) in a week, months or within a year.
2. Intrapersonal goal: a goal that is personal and fixed. This type of goal is peculiar to an individual and might include an action plan or desire to stop a behavior, start a task, improve on an aspect of your life, etc.
3. Normative goal: it's dependent on the achievement of others. It is typically based on an evaluative standard.
4. Long-term goal: it's to be achieved in the distant future. This type of goal are usually in a long period of time such as five (years) and more.
The optimal level of difficulty of a goal occurs when the goal is challenging but not impossible.
Answer:
Cost of Quality Report
Quality Cost Quality Cost Percent of Total Percent of
Classification Quality Cost Total Sales
Prevention $23,400 10.0% 1.3%
Appraisal $46,800 20.0% 2.6%
Internal failure $70,200 30.0% 3.9%
External failure $93,600 40.0% 5.2%
Total $234,000 100.0% 13.0%
percent of total sale = quality cost/$1,800,000
Answer:
3. MOH allocated to job= predetermined MOH rate * actual amount of allocation base used by the job
Explanation:
3. MOH allocated to job= predetermined MOH rate * actual amount of allocation base used by the job
The predetermined overhead rate is used to apply manufacturing overhead costs to production jobs. the quantity of a cost driver required by a particular job is multiplied by a predetermined overhead rate to determine the amount of overhead cost applied to the job.
An estimate is made of
- the amount of manufacturing over head that will be incurred during a specific period of time and
- the amount of the cost driver ( or activity base) that will be used or incurred during the same time period. the predetermined overhead rate is computed as follows
Predetermined Overhead Rate= Budgeted Manufacturing Overhead Cost/ Budgeted amount of cost driver
The predetermined overhead rate is used to apply manufacturing overhead costs to production jobs. The quantity of the cost driver ( or activity base ) required by a particular job is multiplied by the predetermined overhead rate to determine the amount of overhead cost applied to the job.
Answer:
c. The medical center will prevail based upon the written contract
Explanation:
Since they later signed a written contract where it is stated in paper and has their signature that the medical center could not assure nor take any responsibilities for the birth of a kid without any medical, mental or physical defects the medical center has the upperhand on the court, as well as they did in Scalisi et al. v. New York University Medical Center that promised a perfect designed baby, the Scalsi decided for invitro fertilization because of the wife´s family medical history and tendency to autism, and they ended up with a baby with autism, so they sue the New York University Medical center, but the court sided with the NYUMC because of the written contract where it stated that they couldn´t assure the baby to be born without any medica, mental or physical defects.
I Found the answer on internet.
The preferred method for situations involving strategic decision making, projects with a high degree of UNCERTAINTY AND PROJECTS WITH AN UNSTOPPABLE SCOPE IS THE TOP-DOWN APPROACH. TOP DOWN APPROACH IS USED TO ESTIMATE PROJECT TIME AND COSTS.