Answer:
280-4 276
m is ---------- = ---------
140-2 138
y= 2x
The heart's resting heart rate is 2 beats each minute
Step-by-step explanation:
280-4=276
140-2=138
276/138=2 <--- division
Solving a linear equation, we will see that after 9 days he cuts the last section.
<h3>
how many days will he cut the last section?</h3>
We know that the initial length of the piece of cloth is 20m, and the taylor each day cuts a piece of 2 meters of it.
So, the length as a function on the number of days, is:
L(x) = 20m - 2m*x
Here we just need to solve:
L(x) = 2m
Because the last cut is when the long piece measures 4 meters (in that case he does one cut and has the two final pieces of 2 meters).
Solving that, we get:
20m - 2m*x = 2m
20m - 2m = 2m*x
18m/2m = x = 9
After 9 days he cuts the last section.
If you want to learn more about linear equations:
brainly.com/question/1884491
#SPJ1
Let x be the
lowest temperature in may 15
And y the
warmest temperature in may 15
Since the
lowest temperature is 2/3 the warmest temperature during that day, in equation
form
X = (2/3)y
Since the
lowest temperature is 60 F
60 = (2/3) y
<span>Y = 90 F</span>
Answer:
The lenght of the tree sides of the triangle are:
first side: 21 inches
second side: 19 inches
third side: 33 inches
Step-by-step explanation:
a + b + c = 73
b = a - 2
c = a + 12
a = leght of the first side of the triangle
b = lenght of the second side of the triangle
c = lenght of the third side of the triangle
then:
a + (a-2) + (a+12) = 73
3a - 2 + 12 = 73
3a + 10 = 73
3a = 73 - 10
3a = 63
a = 63/3
a = 21 inches
b = a - 2
b = 21 - 2
b = 19 inches
c = a + 12
c = 21 + 12
c = 33 inches
Check:
21 + 19 + 33 = 73
related task:
https://brainly.lat/tarea/1029254