Answer:
1 hour and 42.85 minutes.
Step-by-step explanation:
It is found from the process of reviewing that experience survey a roadbed in 3 hours.
Hence, in 1 hour the experience survey
of the roadbed.
Again, it is found that the apprentice survey needs 4 hours to survey the same stretch of road.
So, in 1 hour the apprentice survey does
of the roadbed survey.
If they work together then in 1 hour, the survey work will be done by (
)=
parts.
Therefore, the total survey they will complete working together in
hours i.e. 1 hour and 42.85 minutes. (Answer)
30-24=6 6/30=0.2
0.2x100=20
20%
the sign would probably be a negative. imagine this - - - - - - and then + + +, cancel out the negatives and plus then you are left with more negatives than positive so the sign will take the negative sign.
1 + -4
2 + -5
3 + -6
4 + -7