Draw a diagram to illustrate the problem as shown in the figure below.
The minimum depth of 2.5 m occurs at 12:00 am and at 12:30 pm.
Therefore the period i0s T= 12.5 hours.
The maximum depth of 5.5 m occurs at 6:15 am and at 6:45 pm. Therefore the period of T = 12.5 hours is confirmed.
The double amplitude is 5.5 - 2.5 = 3 m, therefore the amplitude is a = 1.5 m.
The mean depth is k = (2.5 + 5.5)/2 = 4.0 m
The model for tide depth is

That is,
d = -1.5 cos(0.5027t) + 4
where
d = depth, m
t = time, hours
A plot of the function confirms that the model is correct.
Answer:
240 hours
Step-by-step explanation:
One person hour is a unit indicating the rate at which one person is working on the project .
The company estimates that it will take 2880 person- hours to complete the job
So let's determine how many hours it will take 12 workers to complete same job
The rate = 2880 person/hour
12 persons or workers =( 2880 person/hour)/12 persons
12 persons or workers = 2880/12
12 persons or workers=240 hours
It will take 12 workers 240 person hour to finish the project.
Thank you
Answer:
13m
Step-by-step explanation:
because i use calculator soup
Because if it was even, then it would be divisble by 2 which makes it not prime
A trapezoid is a rectangle.