For this case we have the following function:

By the time the stone is thrown, x = 0.
We must evaluate this value of x in the function.
We have then:
Answer:
The height of the stone at the time is thrown is given by:
h (0) = 15 meters
Answer:
n+n+1+n+2=3n+3=3(n+1)
Step-by-step explanation:
Answer:
Cevap C.
Step-by-step explanation:
Oran 16:24. Her ikisinin de en büyük ortak faktörünü buldum, 48. 48 bölü 16, 3. 48 bölü 24, 2. Yani cevap 3: 2 veya C!
Mantıklı gelmiyorsa özür dilerim, bir çevirmen kullanıyorum, ama umarım yardım etmişimdir!
Total cost job=
Retail price of parts+labor cost+manufacturing overhead
Total cost job 82
Retail price of parts 0
Labor cost=7.5×6.5=48.75
Manufacturing overhead ?
82=0+48.75+?
?=82−48.75
?=33.25
Manufacturing overhead is 33.25
Now find manufacturing overhead rate from the cost of labor
33.25÷48.75=0.682×100=68.2%
The answer 68.2%
One way is to:
First, multiply 2 by the term inside the parenthesis.
Second, add eleven on both sides.
Third, divide using 4x on both sides.
This will give you your first method.