There is a mandatory fixed rate of $ 35 that Raphael will have to pay once the service call has been made. This fixed rate is the constant.
The per hour rate is $20. Suppose the machine took "x" hours to get fixed. Then the variable part of the repair cost will be
.
Thus, Repair Cost=Fixed Rate Cost+Variable Cost
Or,
where
is the total repair cost. Thus, if Raphael ‘s machine took 2 hour to fix, the repair cost is:
dollars.
Therefore, the last option is the correct option.
The slope-intercept form: y = mx + b.
m - slope, b - y-intercept

We have the points (0, 75) → y-intercept (b = 75), and (7, 40).
Substitute the coordimates of the points to the formula of a slope:

<h3>Answer: y = -5x + 75.</h3>
Answer:
5.625¢
Step-by-step explanation:
The amount of energy used by the chandelier is ...
5 × 0.075 kW × 1.5 h = 0.5625 kWh
At 10¢ per kWh, the cost will be ...
0.5625 kWh × 10¢/kWh = 5.625¢ . . . . cost of operation for 90 minutes
Answer:

Step-by-step explanation:
In the picture.
I hope that it's a clear solution.
For every 1/4 metric ton it takes 1/8 hours
then multipling by 8 to make the hours =1
for every 2 metric tons it take 1 hour
so the quotient is 2 metric tons per 1 hour