Answer:
x: work a woman can do in 1 day
y: work a girl can do in 1 day
Then
2x + 7y =1/4
4x + 4y =1/3
4x + 14y =2/4 (1)
4x + 4y =1/3 (2)
=> Let (1) - (2), 10y =2/4-1/3 <=>10y = 1/6 <=> y = 1/(6x10) = 1/60 (work)
=> From (2),4x = 1/3 - 4x1/60 => 4x = 16/60 => x = 4/60 (work)
=> 1 day, a woman and a girl can do: 1/60+4/60 = 5/60 =1/12 (work)
Then, the day required for a woman and a girl to complete work: 12 days
They split it 50/50 that's the answer
3/5×1/3=1/5×1/1=1/5 so 1/5 is you answer
Answer: B. 89
Step-by-step explanation:
-29.202x7= -204.414
-204.414+293.5= 89.086
So the answer is B. 89