1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Stella [2.4K]
3 years ago
13

John spent $75 on a shopping trip for new clothes last week. He had expected to spend $100 on clothes. Complete the table.

Mathematics
2 answers:
artcher [175]3 years ago
8 0

Answer:

What is the ratio? e = 25/75

What is the percent error? f = 33%

Step-by-step explanation:

masha68 [24]3 years ago
6 0

Answer:

I think it would be Column 2

Step-by-step explanation:

You might be interested in
A Ladder that is 32 ft long leans against a building. The angle of elevation of the ladder is 70 degrees. To the nearest tenth o
kolezko [41]
See the picture attached to better understand the problem

we know that
in the right triangle ABC
sin 70°=opposite side angle 70°/hypotenuse


in this problem
opposite side angle 70°=AB
hypotenuse=AC----> 32 ft
sin 70°=AB/32------> AB=32*sin 70°-----> AB=30.07 ----> AB=30.1 ft


4 0
3 years ago
Read 2 more answers
Please help! Solve for g
7nadin3 [17]

Answer:

g= - 32

Step-by-step explanation:

Step 1: Simplify both sides of the equation.

Step 2: Flip the equation.

Step 3: Add 5 to both sides.

Step 4: Multiply both sides by 4/(-1).

g=−32

5 0
3 years ago
Read 2 more answers
Solve each one please and thank you.
Margarita [4]
I can’t tell what i’m solving for? factor? graph? slope?
7 0
2 years ago
If x= 4, calculate the value of: 3x2 + 4x
yaroslaw [1]
Answer 64
Step by step exploration
3*4*4+4*4=48+16=64
3 0
3 years ago
Read 2 more answers
What is the average metabolic rate for a boiler maker who is performing maintenance on the boiler during shutdown and works for
Ann [662]

Answer:

The average metabolic rate for the boiler maker during the 8 hours is 2.475 kcal/min.

Step-by-step explanation:

We can calculate the average as a weighted average.

This weighted average can be expressed as:

\bar M=\dfrac{\sum t_i\cdot M_i}{\sum t_i}=\dfrac{3*3.5+0.5*0.3+3.5*2.5+1*0.4}{3+0.5+3.5+1}\\\\\\\\\bar M=\dfrac{19.8}{8}=2.475

being ti the hours on each task or break, and Mi the metabolic rate for each task or break.

The average metabolic rate for the boiler maker during the 8 hours is 2.475 kcal/min.

3 0
3 years ago
Other questions:
  • Need help not too great with area like this Plz and thank you! A-175in B-140in C-129in D-85in
    12·1 answer
  • By the end of the round 3 of the handshaking activity in the Epidemiology Lab, eight people are infected (of the twenty four peo
    14·1 answer
  • Calc Help Please!!! Urgent!!
    15·1 answer
  • What is the slope of a line that is parallel to the line shown?
    5·1 answer
  • Find the area of the region bounded by the curves y = sin^-1(x/6), y = 0, and x = 6 obtained by integrating with respect to y. Y
    12·1 answer
  • Find the distance between points P(5, 1) and Q(3, 4) to the nearest tenth.
    5·2 answers
  • Is 26 a perfect square? Why or why not?
    8·2 answers
  • Help me please . What is the answer
    12·1 answer
  • Please help asap! i rlly need help on this <br> A. y=x+7<br> B. y= x-7<br> C. y=-5x+2<br> D. y=5x+2
    12·1 answer
  • X2 + y2 + 42x + 38y − 47 = 0. The equation of this circle in standard form is
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!