Answer:
(24, 224 ) i.e. 24 basketball and 224 footballs
Step-by-step explanation:
<em>Basketball :</em>
uses 4 ounces of foam
20 minutes of labor
profit = $2.50
<em>Football :</em>
uses 3 ounces of foam
30 minutes of labor
profit = $2
Manufacturer has :
768 ounces of foam , 120 labor hours per week,
<u>using the simplex method to determine the optimal production schedule so as to maximize profits </u>
lets assume
x = number of basketball
y = number of footballs
maximize = 2.5 x + 2y from a linear programming problem
attached below is the detailed solution
Answer:
none
Step-by-step explanation:
We have three sides
Adding the two smallest sides together must be bigger than the third side
3.1+5.2 > 9.8
8.3> 9.8
This is false, so we cannot make a triangle
C=2pi(r)
Pi=3.14
r=5.5
So C=2(3.14)(5.5)=34.56
So the circumference is 34.56 mi
And the area is A=pi(r)²
So you have
A=3.14(5.5)²
So A=95.03 mi²
So the area is 95.03 mi² and the circumference is 34.56 mi
Hope this helps!
Answer: The correct option would be,
B. total += number
Step-by-step explanation:
Since, the variable used to keep the running total is called sum of the numbers or accumulator,
Thus, accumulator = total + number,
i.e. we obtain accumulator by assigning total to total plus number.
Or, accumulator is,
total += number,
Hence, OPTION 'B' is correct.