Step-by-step explanation:
Distance between Train 1 and Train 2=95 miles
Avg speed Train 1 = 45mph, avg speed Train 2=60mph
If both trains leave at the same time and travel toward each other but on parallel tracks, in how much time will their engines be opposite each other?
:
Let t = travel time (in hrs) until they are opposite each other
:
Like the hint said, when this happens the total distance traveled by both trains will be 95 mi.
:
write a distance equation from this fact: Dist = speed * time
;
Train 1 dist + train 2 dist = 95 mi
45t + 60t = 95
:
105t = 95
t = 95%2F105
t = .90476 hrs
or
.90476 * 60 = 54.3 min
:
:
Check solution by finding the total of the distances the two train travel
45(.90476) + 60(.90476) =
40.7 + 54.3 = 95 mi
I believe the answer is (2,-2)
just hoped i helped mate
(3/10) in = (7/8) mi
1 in = (7/8) mi ÷ (3/10)
= 7/8 * (10/3) = 70/24
1 in = (70/24) mi
It means every 1 inch on the map drawing represents (70/24) miles ≈ 2.917 miles in reality.
U = {a, b, c, d, e, f, g}<br>
A = {a, c, e, g)<br>
B = {a, b, c, d]<br>
Find A U B'
Elza [17]
Answer:
A U B' will be {f} i think so
Answer:
Note Due Date Interest due at Maturity
1 Mar 6 $500
2 Apr 23 $360
3 July 20 $840
4 Sept 6 $945
5 Nov 29 $270
6 Dec 30 $300
Step-by-step explanation:
Calculation to Determine the due date and the amount of interest due at maturity for Flush Mate Co.
Using this formula to Calculate for the amount of interest due at maturity.
Interest due at Maturity= [Face amount * Numbers of days to maturity / 360 * Interest rate]
Note, Due Date, Face Amount, No of days to maturity, Interest rate, Interest due at Maturity
1 Mar 6 80,000× 45/360 ×5% =$500
2 Apr 23 24,000 × 60/360 ×9% =$360
3 July 20 42,000×120/360 ×6% =$840
4 Sept 6 54,000× 90/360 ×7% =$945
5 Nov 29 27,000× 60/360 ×6% =$270
6 Dec 30 72,000× 30/360 ×5% =$300
Therefore the due date and the amount of interest due at maturity for Flush Mate Co are:
Note Due Date Interest due at Maturity
1 Mar 6 $500
2 Apr 23 $360
3 July 20 $840
4 Sept 6 $945
5 Nov 29 $270
6 Dec 30 $300