Answer:
(0.4958, 0.7422)
Step-by-step explanation:
Let p be the true proportion of water specimens that contain detectable levels of lead. The point estimate for p is
. The estimated standard deviation is given by
. Because we have a large sample, the 90% confidence interval for p is given by
where
is the value that satisfies that above this and under the standard normal density there is an area of 0.05. So, the confidence interval is
, i.e., (0.4958, 0.7422).
9514 1404 393
Answer:
4254.31
Step-by-step explanation:
The compound interest multiplier is ...
m = (1 +r/n)^(nt) . . . . annual rate r compounded n times per year, t years
For 11% compounded quarterly for 18 years, the multiplier is ...
m = (1 +0.11/4)^(4·18) = 1.0275^72 ≈ 7.0516671
If 30,000 is the future value, then the present value is ...
PV = FV/m = 30,000/7.0516671
PV ≈ 4254.31
If the price was $1 and it increased by 15% it would now be $1.15 therefore the multiplier is 1.15 as that increases a number by 15%
Answer:
Range is {y | y ≥ –11}
Step-by-step explanation:
This is quadratic equation.
<em>A quadratic equation's range can be found if we find the vertex.</em>
For quadratic equations that have a positive number in front of
, it is upward opening and thus <u>all the numbers greater than or equal to the minimum value of vertex is the range.</u>
The formula for vertex of a parabola is:
Vertex = 
Where,
is the coefficient of 
is the coefficient of 
From our equation given,
and 
Now,
coordinate of vertex is 
coordinate of the vertex IS THE MINIMUM VALUE that we want. We get this by plugging in the
value [
] into the equation. So we have:

Hence, the range would be all numbers greater than or equal to
Third answer choice is the right one.
1.02 is the correct answer i hope this helped<3