1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
SashulF [63]
3 years ago
6

What will most likely happen if a dam is built on a major river system

SAT
1 answer:
Alexandra [31]3 years ago
8 0

Dam building across naturally flowing rivers tend to decrease discharge of surplus water into sea, reduce nutrient concentration in estuaries and coastal waters, and diminish plankton blooms as well as fish landings.

You might be interested in
Why life is hell and love is a lie
Monica [59]
Dang sad boi hours lol
4 0
3 years ago
Read 2 more answers
I had a fox kill a chicken what are ways to scary foxes
monitta
Shoot at it the fox and you should be straight
6 0
3 years ago
Read 2 more answers
If the sun blew up right now how long would it take for us to notice?
uranmaximum [27]
I dunno.. it's so big maybe if it blew up immediately we wouldn't have time to notice before we're baked to perfection.
5 0
3 years ago
Read 2 more answers
All the workers on a 6 person team work at the same rate.
yawa3891 [41]

The number of hours it would take for half of the workers to complete the same job is 96 hours.

<h3>How much does it take to 6 workers to complete the job?</h3>

It is already known 6 workers working at the same rate can complete this job in a total of 48 hours, which means each of the workers represents approximately:

  • 8 hours of work (48 / 6 = 8).

<h3>What happens if the number of workers is reduced?</h3>

In this case, it expected the total of hours to complete the same job increase. Moreover, the time will proportionally increase depending on the reduction of workers. Here are some examples:

  • -1/3 of workers = +1/3 of time
  • -1/5 of workers = + 1/5 of time

This means by reducing the workers to half of the team (-1/2) the time will duplicate.

  • 2 x 48 = 96 hours.

Note: This question is incomplete; here is the possible complete question.

All the workers on a 6 person team work at the same rate. All six members of the team, working together, are able to pour foundations in 48 hours. How many hours would this job take if only half of the team worked on this task.

Learn more about hours in: brainly.com/question/15908953

5 0
3 years ago
During a busy time at the bakery counter.
nasty-shy [4]

Answer:  I would do a.

Explanation:  Then both customers would be happy. I'm pretty sure that is how this works.

7 0
2 years ago
Read 2 more answers
Other questions:
  • According to symbolic interactionism, what is the effect of social stratification on the lower classes of society ?
    12·2 answers
  • High choice best summarize Kennedy’s perspective on scientific progress
    5·2 answers
  • Anyone have any good SAT book recommendations other than Mike Barretts "Black Book" and Erica Meltzer's Grammar and Reading?
    9·1 answer
  • The distance between (x,-2) and the midpoint of (0,5) and (6,15) is 13. What is a possible value of x?
    15·1 answer
  • When parking uphill on a two-way street with no curb, your front wheels should be?
    10·2 answers
  • Prompt
    9·1 answer
  • Kindly make/compose a poem related to supersaturated solution
    5·1 answer
  • A leader decides that his country's citizens should be.
    5·1 answer
  • On a highway, a car is driven 80. Kilometers during the first 1. 00 hour of travel, 50. Kilometers during the next 0. 50 hour, a
    6·1 answer
  • What is the ph of a solution made by mixing 30.00 ml of 0.10 m acetic acid with 50.00 ml of 0.100 m koh? assume that the volumes
    14·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!