The correct answer is: [D]: " <span>x-int : 1 , y-int: 0.5 " .
_____________________________________________________
Note:
_____________________________________________________
The "x-intercept" refers to the point(s) at which the the graph of a function (which is a "line", in this case) cross(es) the "y-axis".
In other words, what is (are) the point(s) of the graph at which "x = 0<span>" ?
</span>
By examining the graph, we see that when " x = 0" ; y is equal to: "1<span>" .
</span>
So; the "x-intercept" is at point: "(0, 1)" ; or, we can simply say that the
"x-intercept" is: "1" .
_________________________________________________________</span> Note:
_____________________________________________________
The "y-intercept" refers to the point(s) at which the the graph of a function (which is a line, in this case) cross(es) the "x-axis".
In other words, what is (are) the point(s) of the graph at which " y = 0 <span>" ?
</span>
By examining the graph, we see that when " y = 0 " ; x is equal to: "0.5<span>" .
</span>
So; the "x-intercept" is at point: "(0.5, 0)" ; or, we can simply say that the
"y-intercept" is: "0.5 " .<span>
______</span>_________________________________________________
This would correspond to:<span>
_______________________________________________________
Answer choice: [D]: </span>" x-int: 1 , y-int: 0.5 " .
_______________________________________________________
{that is; The "x-intercept" is: "0" ; and the "y-intercept" is: "0.5 ".} .
_______________________________________________________
Given the amount of water needed to fill the cement dam and the water pump rate, the time needed to fill the dam is 400 minutes or 6hours 40minutes.
Option B)6h 40min is the correct answer.
<h3>How long does it take to fill the dam?</h3>
Given that;
- Amount of water needed to fill the dam A = 30000 litres
- Pump rate r = 75 litres per minute
- Time needed to fill the dam T = ?
To determine how long it take to fill the dam, we say;
Time need = Amount of water needed ÷ Pump rate
T = A ÷ r
T = 30000 litres ÷ 75 litres/minute
T = 400 minutes
Note that; 60min = 1hrs
Hence,
T = 6hours 40minutes
Given the amount of water needed to fill the cement dam and the water pump rate, the time needed to fill the dam is 400 minutes or 6hours 40minutes.
Option B)6h 40min is the correct answer.
Learn more word problems here: brainly.com/question/2610134
#SPJ1
Hey!
------------------------------------------------
x – 3y = 3 is written in standard form. We can write in the slope-intercept form.
x - 3y = 3
x - 3y - x = 3 - x
3y = 3 - x
3y/3 = 3/3 - 3/x
y = 1 - 3/x
y = 1/3x - 1
Now, we know that the y-intercept is -1 and the slope is 1/3
------------------------------------------------
Hence, the answer is 
------------------------------------------------
Hope This Helped! Good Luck!
There is literally no question