It’s a reflection across the line x=3
----------------------------------------------
Calculate Jean's rate
----------------------------------------------
Jean takes 8 hours to fill the pool.
So in 1 hour, she can fill 1/8 of the pool
----------------------------------------------
Calculate Mark's rate
----------------------------------------------
Mark takes 12 hours to fill the pool.
So in 1 hour, he can fill 1/12 of the pool.
----------------------------------------------
Calculate their rate if they work together
----------------------------------------------
Jean = 1/8
Mark = 1/12
1/8 + 1/12 = 3/24 + 2/24 = 5/24
They will fill 5/24 of the pool in 1 hour
----------------------------------------------
Find number of hours needed to fill up the pool
----------------------------------------------
I hour = 5/24 of the pool
1 ÷ 5/24 hour = 5/24 ÷ 5/24 of the pool
24/5 hour = Whole pool
Whole pool = 24/5 hours
Whole pool = 4 4/5 hours or 4.8 hours
----------------------------------------------
Ans: The supervisor is not correct, it will take only 4.8 hours if both of them work together.
----------------------------------------------
You would save 407 dollars by getting the kids at 19 a piece and the adults at 25 a piece instead of paying the 32 dollars for each person
Answer:
613.5 m^2
Step-by-step explanation:
The area of the base is
A = 1/2 bh
= 1/2 (10) (8.7) =43.5 m^2
We have three sides with all the same area
The area of one side is 10 * 16 = 160
3 * 160 = 480 m^2
Now to the top
We have 3 sides with the same area
The area of one side
A = 1/2 bh
A = 1/2 (10) (6)
= 30 m^2
3* 30 = 90
Add all the areas together to get the total surface area
43.5 m^2+ 480 m^2 + 90 m^2
613.5 m^2