Answer:
1 + x - 15 =-2/2/3
x-14=-2/2/3
x-14=-.33
x=14.33
Step-by-step explanation:
Answer:
0.3
Step-by-step explanation:
Answer:
(a) 0.119
(b) 0.1699
Solution:
As per the question:
Mean of the emission,
million ponds/day
Standard deviation,
million ponds/day
Now,
(a) The probability for the water pollution to be at least 15 million pounds/day:


= 1 - P(Z < 1.178)
Using the Z score table:
= 1 - 0.881 = 0.119
The required probability is 0.119
(b) The probability when the water pollution is in between 6.2 and 9.3 million pounds/day:



P(Z < - 0.86) - P(Z < - 1.96)
Now, using teh Z score table:
0.1949 - 0.025 = 0.1699
Answer:
5x+56
Step-by-step explanation:
5x+8(5+2)
5x+8(7)
Answer:
x = 8
Step-by-step explanation:
3(x-4) = 12
3x - 12 = 12
+ 12 + 12
3x = 24
/ 3 / 3
x = 8