1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
V125BC [204]
3 years ago
7

I need help with this. Instructions: Write an inequality for each problem and solve.

Mathematics
1 answer:
charle [14.2K]3 years ago
6 0

answer:

step-by-step explanation:

Hope this helps :)

You might be interested in
WILL GIVE BRAINLIEST AND I SWEAR TO GOD IF ONE MORE BOT ANSWERS AND MAKES IT TO WHERE NO ONE ELSE CAN ANSWER
trasher [3.6K]

Answer:

local governments have the most power

Step-by-step explanation:

I hope this is right, but federalism gives more power to the state, so local governments could potentially have more power.

3 0
3 years ago
Read 2 more answers
The number of cases of a new disease can be modeled by the quadratic regression equation y = –2x2 + 36x + 6, where x represents
nirvana33 [79]

Since x represents the year, year 15 will be 15 years.

Plug in "15" as your "x"

y = -2(15)^2 + 36(15) + 6

15^2 = 225 (Exponents come before multiplication)

y = -2(225) + 36(15) + 6

y = -450 + 540 + 6

y = 90 + 6

y = 96

<em>The answer is B</em>

3 0
3 years ago
Domain and range of Y=2x-1
LenaWriter [7]

Step-by-step explanation:

it would be 34y i got right answer

8 0
1 year ago
Write the order of operations down using your own words​
dybincka [34]

The order of operations is:

Parentheses, Exponent, Division, Multiplication, Addition, Subtraction.

Or PEMDAS.

hope it helps!

6 0
3 years ago
An assembly line with 10 tasks needs be designed. The total time for all tasks is 16 minutes. If you need to produce 30 units/ho
Sindrei [870]

Answer: 8 minimum work stations is what would be needed.

Step-by-step explanation:

The cycle time is computed as the operating time daily divided by the scheduled output.

It is important to note that the daily capacity of the operation layout is the operating time divided by the cycle time.

Therefore,

If you need to produce 30units/hour.

The average cycle time is as follow:

The average cycle time is the average time between the completions of units.

60/30= 2 average cycle time

=16/2

=8

8 work stations is the minimum number that would be needed.

It is important to know that in an assembly line balancing, the minimum number of work station is the ratio of the sum of all tasks time to the cycle time.

5 0
3 years ago
Other questions:
  • Ridley bought 3 3/4 yards of blue fabric,12 5/6 yards of red fabric,and 7 2/3 yards of purple fabric.if she paid $7.50 per yard,
    6·1 answer
  • You are attending a college night. There is a different school in each classroom. Of the schools in attendance 30% had a sports
    10·1 answer
  • HELPPP ME PLEASE I NEEDA HELP <br> p.s if u see this please answer look at the picture
    11·2 answers
  • What is the value of u?
    8·1 answer
  • 1.The area of the KM 89 Farm in San Vicente is (x²+7x +12) sq meters. If its width is (x + 3) meters, what is the length of the
    14·1 answer
  • SOMEONE HELP ME PLEASE
    13·1 answer
  • Math question... lol
    13·2 answers
  • Can anyone please solve this and tell me if it's correct please
    15·1 answer
  • __•__=42<br> __+__=23<br><br><br> Can someone help me solve this?
    13·1 answer
  • A line segment has a length of 10 units. The line segment undergoes a translation up 5 units and left 5 units from its original
    14·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!