1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
steposvetlana [31]
2 years ago
15

the average length of string a and string d is 10x cm . the average length of string b and string c is 8x cm . the average lengt

h of string b , c, d is 6x cm . find the length of string a is terms of x
Mathematics
1 answer:
klasskru [66]2 years ago
4 0

Answer:

a= 18x

Step-by-step explanation:

(a+d)/2 = 10x   (1)

(b +c)/2 = 8x  (2)

(b+c+d)/3 = 6x (3)

From the equation 2, we have (b+c)= 8x *2 = 16x

From the equation 3, we have d= 6x*3 - (b+c)= 18x- 16x = 2x

From the equation 1, we have a= 10x*2 -d= 20x - 2x= 18x

You might be interested in
Can someone please help me
xenn [34]

Answer:

install socratic that give u all math questions

5 0
3 years ago
Read 2 more answers
The sum of 6 consecutive odd numbers is 204. What is the fourth number in this sequence?
Korolek [52]

204 /6 = 34

29 +31 +33 + 35 +37 +39 = 207

4th number = 35

6 0
2 years ago
Read 2 more answers
Tim and Tom are painters. Tim and Tom are painting a crate. Tom paints 10 sq ft per minute. They painted a particular crate in 1
slava [35]
Tom-------------- >10 sq ft per minute

Tim------------------- >3.5*10=35 sq ft per minute

 Both painters (10+35)=45 sq ft per minute

 let's assume a cubic unit crate----------> V1=1*1*1=1 feet3

<span>the total surface of the cube is S1=6*(1*1)=6 </span>sq ft

 if the volume of the cube increases twice 

V2=2 feet3 ------------------- >    2=x*x*x------------- >x=2^(1/3)

And the S2=6*(2^(1/3)*<span> 2</span>^(1/3)=9.5244 sq ft

V2/V1=9.5244/6=1.5874

Therefore

If Tim and Tom----------------------- > take 1 day----------- > to paint a crate V1

For the crate V2------------- > take 1.5874 days 

assuming an 8-hour work day

 0.5874*8=4.70 hr-------------- > 4 h 42 min

 The answer is 1 day 4h 42 min

6 0
3 years ago
Please help me with this math problem
iren [92.7K]

Answer:

The third one

Step-by-step explanation:

6 0
3 years ago
Read 2 more answers
The solution to the system of equations shown is (2, 0).
alexandr1967 [171]
When the multiples of the equations in a system is added or subtracted, the resulting equation together with any of the original equation will result in the same answer.
Hence, the system of equations
x + 4y = 2
7x = 14
will also have a solution of (2, 0).

6 0
2 years ago
Read 2 more answers
Other questions:
  • $46 shoes; 2.9% tax what is the answer?
    8·2 answers
  • Please please please please please please please please answer as soon as possible. All answers are truly appreciated. Thank you
    10·1 answer
  • PLEASE HELP
    12·1 answer
  • A boat travels 39 miles in 4 hours and 20 minutes. What is the speed of the boat in miles per hour?
    14·1 answer
  • The first Ferris wheel was built in 1893 in Chicago. It's diameter was 250 feet. How many feel did the Ferris wheel rotate with
    5·1 answer
  • If f(x)=3x^2+15, what is the value of f(4).
    8·2 answers
  • There are 80 people at the city swim park today. Everyone in the park was wearing swim suits or sunglasses, some people had both
    9·1 answer
  • Could someone help me understand how to solve this?
    9·1 answer
  • Jerry recently started working for a company that pays him an
    9·2 answers
  • Hannie has a bag of pipe cleaners. There are 5 tangerine, 4 periwinkle, 6 magenta, and 9 scarlet pieces. What is the ratio of to
    14·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!