2,500 feet is the answer to your question. hope this helped
Answer:
A. 0.0001
Step-by-step explanation:
z-statistic:
The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
In this question:
The value of the z-statistic is z = 3.74.
The desired probability is 1 subtracted by the pvalue of z = 3.74.
z = 3.74 has a pvalue of 0.9999
Then
1 - 0.9999 = 0.0001.
So the correct answer is given by option A.
Answer:
I'm pretty sure its 1 1/8
Step-by-step explanation:
False, you need a line between the two in order for them to be two adjacent lines, otherwise they would only be on line. The two vertical lines are separated by the other, making it not adjacent.
Answer:
C. each result is equally likely to occur
Step-by-step explanation:
There are only two options, heads or tails. And they both have a 50% chance.