Answer: graph E.
A geometric sequence can be written as:

where:
a₁ = first term = 4
r = ratio = 0.5
Substituting the numbers, we have:

or else

This is an exponential function with base less than 1. Therefore, we can exclude graph C (which depicts a linear function), and graphs A and D (which depict an exponential function with base greater than 1).
In order to choose between graph B and E, let's evaluate the function in two different points:


Therefore, we need to look for the graph passing through the points (1, 4) and (2, 2). That is graph E.
Answer: 18+54
Step-by-step explanation:
6*3=18 and 6*9=54
Answer:
write si quema kehhhhhhhhhhhh kehh ok
or si quema cuhhhhhh cuhhhhhhhh ok
Answer: 2.5 hours is the answer
Step-by-step explanation:
It took Travis 2.5 hours to complete 3/4 of his trip. To find the average speed, we need to find his speed during 3/4 of the trip and then the 52.5 miles.
So you know that 52.5 is 1/4 of his total trip. That means if we multiply that by 3, that's how many miles he traveled in 2.5hrs. (157.5)
To calculate speed, divide distance by time.
For 3/4 of his trip (157.5), it took him 2.5 hours.
157.5/2.5 = 63mph
For the remaining 52.5 miles, it took him an hour.
52.5/1 = 52.5mph
Now average those two speeds to get the average speed for the whole trip.
(63+52.5)/2= 57.6mph
Answer:
A. what was the final score of the game last night
Step-by-step explanation: