A construction manager needs 12 workers to complete a building project in 54 days, we can write;
12 workers = 54 days
T find the number of workers needed to complete the same project in T days, we will write;
x workers = T days
Divide both equations
12/x = 54/T
Cross multiply
12T = 54x
x = 12T/54
x = 2T/9
Hence the number of workers needed to complete the same project in T days is 2T/9 workers
Based on the above scenario, the sales director conducted an <u>experiment</u>.
- Because a treatment <u>was </u>applied to the sales representatives.
- The the best statistical study for this situation because the sales director is trying to establish <u>correlation</u>.
<h3>What is an experiment?</h3>
An experiment is known to be a method that is et up with the aim to test a given hypothesis as a component of a scientific method.
In an experiment, there are the two key variables which are the independent and dependent variables. The independent variable is known to be a controlled or it is tested against the dependent variable.
See full question
Part A.
The sales director conducted a.) an experiment b.) a survey c.)an observational study because a treatment a.) was not b.)was applied to the sales representatives.
This is the best statistical study for this situation because the sales director is trying to establish a.) causality b.) correlation.
Learn more about experiment from
brainly.com/question/17274244
Answer:
118 ounces
Step-by-step explanation:
14.75 • 8 = 118
Rotation about a point does not change any dimensions. C'D' = CD = 2.8 units.
Answer:
c
Step-by-step explanation: