1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
goblinko [34]
3 years ago
12

PLS HELPPP ASAP

Mathematics
1 answer:
alex41 [277]3 years ago
7 0

Answer:

They are similar.

Step-by-step explanation:

They have same angles.

Triangle =180°

49+82+49=180

You might be interested in
For your own safety, the bank representative says that the following characteristics of PIN numbers are prohibited: ​​(1) all fo
ivanzaharov [21]

Answer:

Total = N(1) +N(2)+N(3) = 10+14+200 = 224 sequences

224 sequences would NOT be permitted.

Step-by-step explanation:

1) all four digits identical

Number of possible PIN with all four digits identical N(1) = 1×1×1×10 = 10 possible PIN

2) sequence of consecutive ascending or descending digits N(2) = 14

Only Ascending starting with 0,1,2 = 3

only descending for 7,8,9 = 3

and both for 3,4,5,6 = (2×4)

Total = 3+3+(2×4) = 14

3) any sequence starting with 19 or 20 (birth years

N(3) = 2 × 1×1×10×10 = 2×100 = 200

N(3) = 200

(Note : 100 possible ways for each of 19 or 20s)

Total = N(1) +N(2)+N(3) = 10+14+200 = 224

224 sequences would NOT be permitted.

7 0
3 years ago
I’m 11 years old <br><br><br><br><br><br><br><br><br><br>Jk I’m not I could rlly use a hand tho
horsena [70]

Answer:

880

Step-by-step explanation:

3 0
2 years ago
Read 2 more answers
-3x-3y=9 need help what is this​
Bad White [126]

Answer:

X equals negative 3 and y equals zero.

3 0
2 years ago
A construction crew is lengthening a road. Let L be the total length of the road (in miles). Let D be the number of days the cre
djverab [1.8K]

Answer:

Set of Values for Domain = {1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75, 76, 77, 78, 79, 80}

Set of Values for Range = {402, 404, 406, 408, 410, 412, 414, 416, 418, 420, 422, 424, 426, 428, 430, 432, 434, 436, 438, 440, 442, 444, 446, 448, 450, 452, 454, 456, 458, 460, 462, 464, 466, 468, 470, 472, 474, 476, 478, 480, 482, 484, 486, 488, 490, 492, 494, 496, 498, 500, 502, 504, 506, 508, 510, 512, 514, 516, 518, 520, 522, 524, 526, 528, 530, 532, 534, 536, 538, 540 542, 544, 546, 548 550, 552, 554, 556, 558, 560}.

Step-by-step explanation:

Solution...

Assume that there is a link for the road between your house and the market the road maintenance team is meant to repair the road.

now the system of work is that the length of the road they will work upon is equal to 2 times the amount of days + 400.

This is to say that originally there is 400 miles of the road, and once they work in a day they add 2 more miles to the original 400. if they work in 2 days they add 4 more miles to the original 400. If they work in 3 days they add 6 more miles to the original 400.

So L = 2(D) + 400.

Answer 1.

description of the values in both the domain and range of a function.

the domain is the set of all values for which the function is defined.

this means that the domain is all numbers between 0 to 80.

Why do we begin from 0, because when you put 0 into the equation you have, L = 2(0) + 400, and this is equal to 2 x 0 + 400 or 400 + 0 (since all numbers multiplied by 0 gives 0).

Why is 80 the maximum, this is because they work for at most 80 days.

So the domain is

D = {1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75, 76, 77, 78, 79, 80}

And the range is the set of all values that L (which is the function) takes, to get this you have to calculate the days from day 0 to day 80.

The range for the function is...

L = {402, 404, 406, 408, 410, 412, 414, 416, 418, 420, 422, 424, 426, 428, 430, 432, 434, 436, 438, 440, 442, 444, 446, 448, 450, 452, 454, 456, 458, 460, 462, 464, 466, 468, 470, 472, 474, 476, 478, 480, 482, 484, 486, 488, 490, 492, 494, 496, 498, 500, 502, 504, 506, 508, 510, 512, 514, 516, 518, 520, 522, 524, 526, 528, 530, 532, 534, 536, 538, 540 542, 544, 546, 548 550, 552, 554, 556, 558, 560}.

So how did we get all these. Using the figures registered as D to get the L.

Before solving, remember that, (HD is H•D or H × D,

2D is 2•D or 2 × D,

29F is 29•F or 29 × F... When numbers are used to multiply letters which stand as a varying value like X, Y, D etc, then they are written as 2x or 2•x or 2(x). They all mean multiply 2 by x)

So, i.e.

L = 2(D) + 400.

When it's day 1, D is 1

L = 2(1) + 400 which equals 2 + 400 = 402. So for 1 day, the crew has worked 402 miles.

On Day 2, D is 2

L = 2(2) + 400 which equals 4 + 400 = 404. So for 2 days, the crew has worked 404 miles.

On Day 3, D is 3

L = 2(3) + 400 which equals 6 + 400 = 406. So for 3 days, the crew has worked 406 miles.

On Day 4, D is 4

L = 2(4) + 400 which equals 8 + 400 = 408. So for 4 days, the crew has worked 408 miles.

On Day 5, D is 5

L = 2(5) + 400 which equals 10 + 400 = 410. So for 5 days, the crew has worked 410 miles.

On Day 6, D is 6

L = 2(6) + 400 which equals 12 + 400 = 412. So for 6 days, the crew has worked 412 miles.

...

...

...

For 7 days, the crew has worked 414 miles.

For 8 days, the crew has worked 416 miles.

For 9 days, the crew has worked 418 miles.

For 10 days, the crew has worked 420 miles.

For 20 days, the crew has worked 440 miles.

For 30 days, the crew has worked 460 miles.

For 40 days, the crew has worked 480 miles.

For 50 days, the crew has worked 500 miles.

For 60 days, the crew has worked 520 miles.

For 70 days, the crew has worked 540 miles.

For 75 days, the crew has worked 550 miles.

...

...

...

On Day 79, D is 79

L = 2(79) + 400 which equals 158 + 400 = 558. So for 79 days, the crew has worked 558 miles..

On Day 80, D is 80

L = 2(80) + 400 which equals 160 + 400 = 560. So for 80 days, the crew has worked 560 miles.

That is how the domain and range is determined.

6 0
3 years ago
the width of a rectangle is 2/3 length, The perimeter of the rectangle is 100 ft. What is the width, in feet, of the rectangle.
lakkis [162]

Answer:

The width would be 20 and the length would be 30

Step-by-step explanation:

7 0
2 years ago
Other questions:
  • Use the quadratic formula to solve the equation.<br><br>-3x^2 - x - 3 = 0
    14·1 answer
  • 64^x = 16^ x - 1<br><br> A: -2<br> B: -1<br> C: -1/4<br> D: -1/3
    15·1 answer
  • How do you set this up?
    7·1 answer
  • Problem Ari thinks the perfect milkshake has 333 ounces of caramel for every 555 scoops of ice cream. Freeze Zone makes batches
    13·1 answer
  • Anyone know how to do this?
    10·1 answer
  • Solve 1.5(4−w)=−(1.5w−8). <br> Will give rewards.
    5·1 answer
  • Who knows what 0.976 + 0.99
    14·2 answers
  • Lisa is packing a set of cubic inch blocks into the box shown below How many blocks will fit in the box8 in.5 in.3 in.A.16B. 32C
    10·1 answer
  • Which phrase represents 3y +9
    13·1 answer
  • This is pretty confusing to me please help me..........
    11·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!