1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
sashaice [31]
3 years ago
10

What is the value of this expression if h = 8,3 = -1, and k = –12?

Mathematics
1 answer:
snow_tiger [21]3 years ago
3 0

Answer: C.36

Step-by-step explanation:

You might be interested in
6x-5y=15<br> x=y+3 <br> what does x= and what does y=
Zepler [3.9K]

Answer:

(0,-3)

Step-by-step explanation:

hi, with this we can just do substitution (substitute x for y+3)

6(y+3)-5y=15

evaluate

6y+18-5y=15

y+18=15

y=-3

then we plug that in

x=-3+3

x=0

4 0
3 years ago
30 men repair a road in 56 days by working 6 hours daily. In how many days 45 men will repair the same road by working 7 hours d
svetoff [14.1K]

Step-by-step explanation:

(30 men, 56 days, 6 hours daily)

=> (30 men, 48 days, 7 hours daily)

=> (45 men, 32 days, 7 hours daily)

Hence it will take 32 days.

5 0
3 years ago
Simplify.<br> (2 - 61) - (-10 + 4i)
ankoles [38]

Answer:

− 49 − 4 i

hope this helps

4 0
3 years ago
Read 2 more answers
sarah can complete a project in 90 minutes and her sister betty can complete it in 120 minutes if they both work on the project
alukav5142 [94]

Answer:

It will take them approximately 51.43 minutes to complete the project together

Step-by-step explanation:

This is what is called a "shared job" problem.

The best way to work on them is to start by finding the "portion" of the job done by each of the people in the unit of time.

So, for example, Sarah completes the project in 90 minutes, so in the unit of time (that is 1 minute) she completed 1/90 of the total project

Betty completes the project in 120 minutes, so in the unit of time (1 minute) she completes 1/120 of the total project.

We don't know how long it would take for them to complete the project when working together, so we call that time "x" (our unknown).

Now, when they work together completing the entire job in x minutes, in the unit of time they would have done 1/x of the total project.

In the unite of time, the fraction of the job done together (1/x) should equal the fraction of the job done by Sarah (1/90) plus the fraction of the job done by Betty. This in mathematical form becomes:

\frac{1}{x} =\frac{1}{90} +\frac{1}{120}\\\frac{1}{x} =\frac{4}{360} +\frac{3}{360}\\\frac{1}{x} =\frac{7}{360} \\x=\frac{360}{7} \\x=51.43\,\,min

So it will take them approximately 51.43 minutes to complete the project together.

8 0
4 years ago
Place the following temperatures in order from coldest to hottest: -8°C, 10°C, -5°F, 40°F
vova2212 [387]
-5f, -8c, 40f, 10c happy math..ing
6 0
3 years ago
Read 2 more answers
Other questions:
  • what are the coordinates of a point on the unit circle if the angle formed by the positive x- axis and the radius is 45°??
    7·1 answer
  • Condensing Logarithmic Expression In Exercise,use the properties of logarithms to rewrite the expression as the logarithm of a s
    11·1 answer
  • The sum of two numbers is 21. The larger number is 6 less than twice the smaller number. Find the two numbers.
    14·1 answer
  • The figure is drawn on centimeter grid paper. Find the perimeter of the shaded figure to the nearest tenth.
    5·2 answers
  • What is 16.80 divide by 4.96 =
    7·2 answers
  • Vertical angles do or do not share a common side?
    15·2 answers
  • Which of the following points would fall on the line produced by the point-slope form equation y - 8 = 4/5(x - 1) when graphed​
    5·1 answer
  • The scale of a map is given as 1 : 20000000. Two cities are 6 cm apart on the map. Find the actual distance between them.
    9·1 answer
  • What is the value of x
    10·1 answer
  • Math the expression to its side
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!