It takes 1.5 hours for 4 workers to paint the same room
<em><u>Solution:</u></em>
Given that 3 workers can paint a room in 2 hours
To find: Time taken for 4 workers to paint the same room
Assume the time needed to paint the room is inversely proportional to the number of worker

Where, "k" is the constant of proportionality
<em><u>3 workers can paint a room in 2 hours</u></em>
Substitute number of workers = 3 and time = 2 hours

Therefore,

To find time taken for 4 workers to paint the same room, substitute number of workers = 4 in above expression

Thus it takes 1.5 hours for 4 workers to paint the same room
Answer:
325 miles and 77 dollars
Step-by-step explanation:
First, create equations. Let x equal the miles driven. The first plan expression is 38 + 0.12x and the second plan expression is 51 + 0.08x. Setting these equal and solve for x: 38 + 0.12x = 51 + 0.08x -> 0.04x = 13 -> x = 325 miles.
The cost is found by substituting it into any of the expressions: 51 + 0.08(325) = 77 or 38 + 0.12(325) = 77
the answer is
x=8y/3(1-8y)
y=3x/8(1+3x)
hope this helped l used cymath to solve this problem.
good day : )
4/52 = 1/13 <== here ya go
Slope: (y2-y1)/(x2-x1)
(-3+2)/(-1+1) = -1/0 = undefined
The slope is undefined