Answer:
a: 28 < µ < 34
Step-by-step explanation:
We need the mean, var, and standard deviation for the data set. See first attached photo for calculations for these...
We get a mean of 222/7 = 31.7143
and a sample standard deviation of: 4.3079
We can now construct our confidence interval. See the second attached photo for the construction steps.
They want a 90% confidence interval. Our sample size is 7, so since n < 30, we will use a t-score. Look up the value under the 10% area in 2 tails column, and degree of freedom is 6 (degree of freedom is always 1 less than sample size for confidence intervals when n < 30)
The t-value is: 1.943
We rounded down to the nearest person in the interval because we don't want to over estimate. It said 28.55, so more than 28 but not quite 29, so if we use 29 as the lower limit, we could over estimate. It's better to use 28 and underestimate a little when considering customer flow.
3 different ones. M-N-& P. Please
Answer:
These opposite angles are called Vertical Angles.
Answer:
5.4 > x > 2.8
Step-by-step explanation:
Sum of two sides is always greater than the third side
Case1 :
4.1 + 1.3 > x
5.4 > x
Case2:
4.1 + x > 1.3 or 1.3 + x > 4.1
x > 1.3 - 4.1 or x > 4.1 - 1.3
x > - 2.8 or x > 2.8
Note that it is obvious x is not -ve so neglect -2.8. x > 2.8
Hence,
5.4 > x > 2.8
Answer:

Step-by-step explanation:
we know that
The simple interest formula is equal to
where
I is the Final Interest Value
P is the Principal amount of money to be invested
r is the rate of interest
t is Number of Time Periods
in this problem we have
substitute in the formula above
solve for t
