1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
svlad2 [7]
3 years ago
12

Two parallel lines are crossed by a transversal

Mathematics
1 answer:
Olegator [25]3 years ago
8 0
B. H=60
180degrees-120degrees=60degrees
You might be interested in
Guerby ran 10 miles in 2 hrs, how many miles did he run in 1hr?
Strike441 [17]

Answer:

5 not including rests and what speed.

Step-by-step explanation:

plz mark me brainlyiist :)

8 0
3 years ago
A manufacturer must test that his bolts are 4.00 cm long when they come off the assembly line. He must recalibrate his machines
storchak [24]

Answer:

The null hypothesis is H_o: \mu = 4.

The alternate hypothesis is H_a: \mu \neq 4

The pvalue of the test is 0.0182 < 0.05, which means that there is sufficient evidence to show that the manufacturer needs to recalibrate the machines.

Step-by-step explanation:

A manufacturer must test that his bolts are 4.00 cm long when they come off the assembly line.

This means that the null hypothesis is that they are 4.00 cm long, that is:

H_o: \mu = 4

At the alternate hypothesis we test if it is different. So

H_a: \mu \neq 4

The test statistic is:

z = \frac{X - \mu}{\frac{\sigma}{\sqrt{n}}}

In which X is the sample mean, \mu is the value tested at the null hypothesis, \sigma is the standard deviation and n is the size of the sample.

4 is tested at the null hypothesis:

This means that \mu = 4

After sampling 196 randomly selected bolts off the assembly line, he calculates the sample mean to be 4.14 cm.

This means that n = 196, X = 4.14

He knows that the population standard deviation is 0.83 cm.

This means that \sigma = 0.83

Value of the test statistic:

z = \frac{X - \mu}{\frac{\sigma}{\sqrt{n}}}

z = \frac{4.14 - 4}{\frac{0.83}{\sqrt{196}}}

z = 2.36

Pvalue of the test and decision:

The pvalue of the test is the probability that the sample mean is different by at least 4.14 - 4 = 0.14 from the target value, which is P(|z| > 2.36), which is 2 multiplied by the pvalue of z = -2.36.

Looking at the z-table, z = -2.36 has a pvalue of 0.0091

2*0.0091 = 0.0182

The pvalue of the test is 0.0182 < 0.05, which means that there is sufficient evidence to show that the manufacturer needs to recalibrate the machines.

5 0
3 years ago
Is 12/19 rational or irrational?
kodGreya [7K]

Answer:

irrational

Step-by-step explanation:

5 0
2 years ago
Give an example of an experiment for each of the following.
bixtya [17]

Answer:

ok i'll see what i can do

Step-by-step explanation:

6 0
2 years ago
A marathon is 131/5 miles long. If 4 people divide up the distance equally, how many miles does each person need to run?
disa [49]

Answer:

6\frac{11}{20}\ mi

Step-by-step explanation:

we know that

A marathon is 131/5 miles long

If 4 people divide up the distance equally,

then

Divide the total distance by 4

\frac{(131/5)}{4}=\frac{131}{20}\ mi

Convert to mixed number

\frac{131}{20}\ mi=\frac{120}{20}+\frac{11}{20}=6\frac{11}{20}\ mi

8 0
3 years ago
Other questions:
  • Please Help!!!!!!!<br> Simplify (√5)(3√5).
    13·1 answer
  • The volume of a right circular cone varies jointly as the altitude and the square of the radius of the base. If the volume of th
    12·1 answer
  • Please help with this
    13·1 answer
  • Which is the standard form of the equation with p=21 phi=7pi/6
    13·2 answers
  • 3×0.7= <br> And could you please do the model
    8·1 answer
  • the chef is making 10.5 batches of dinner rolls. For each batch, he kneaded dough for 0.7 and let the dough rest for 1.6 hours.
    13·1 answer
  • Answer with A B C D. Correct answer gets brainlest.
    11·2 answers
  • Lorenzo rides his bike at a rate of 5yards per second. about how many miles per hour can he ride his bike?
    10·1 answer
  • (Need help asap) A company has 10,000 employees that work at 6 different locations. The company wants to determine the number of
    9·1 answer
  • Help plz
    8·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!