1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
jek_recluse [69]
3 years ago
9

What would be the rate of change for this data ?

Mathematics
1 answer:
shutvik [7]3 years ago
8 0

Answer: A

THE WATER LEVEL RISES 2 INCHES EVERY HOUR

Step-by-step explanation:

you times the inches by 2

You might be interested in
Find the volume of the triangular prism 11mi 10mi 8mi 6mi<br><br> 20 points and marked as brainliest
Nady [450]
Don’t trust the link sir\miss
7 0
3 years ago
If you drove 60 miles in two hours, how many miles per hour did you drive?<br><br> 30 miles per hour
soldi70 [24.7K]

Answer:

30 mph

Step-by-step explanation:

6 0
3 years ago
Read 2 more answers
Helpp me please
Evgesh-ka [11]

Answer:

15 B

16 B

17 A

Step-by-step explanation:

A triangle is a figure with three sides.

Which can be re-written in the if-then form as If  the figure is a triangle then it has three sides.

The elevator has a MAX capacity of 8 people. This means that only 8 or less people can be on the elevator at a time. If c = # of people then c must be less than or equal to 8 as the elevator has a max capacity of 8 people. Hence the mathematical statement would be c ≤ 8

When the inequality sign is facing the "y" the solutions to the set can be found above the line. This could also be checked by graphing.  

8 0
3 years ago
In a class of 28 students, 16 play an instrument and 11 play a sport. There are
NARA [144]

Answer: 6/11

Step-by-step explanation:

28 - 7 = 21

16 + 11 - 21 = 6

11 - 6 = 5

16-6 = 10

10 + 5 15

P (a) = 16/28

p (b) = 11/28

A I B = 6/28/11/28 = 6/11

5 0
2 years ago
A building company used 24 workers to prepare a building site. The site measured 30 acres and the work was completed in 10 days.
maks197457 [2]

Answer:

30 workers are required.

Step-by-step explanation:

If the site measured 30 acres and was completed in 10 days, then it can be said that on average \frac{30}{10} = 3\frac{acres}{day} were made.

Then, 24 workers completed 3 acres / day.

Then, \frac{24.workers}{\frac{3acres}{day}} = \frac{8..Workers * days}{acre}

8 workers can complete 1 acre per day

Now to know how many workers are needed to complete 45 acres in 12 days, we multiply:

8\frac{Workers * days}{acre}*\frac{45}{12} \frac{acres}{days} = 30.workers.

Finally, 30 workers are required.

To solve this problem it was assumed that everyone worked at the same pace, which may not be true, the fact that some work at a slower or faster pace than another could alter the result, causing them to finish less or more acres by day.

6 0
3 years ago
Other questions:
  • What is 763 thousands in scientific notation
    9·2 answers
  • Find the remainder of (x4 – 2) ÷ (x + 1).
    11·1 answer
  • Write a division problem. Show two different ways that you can estimate the quotient using compatible numbers.
    6·1 answer
  • 7 divided by 86 using long division
    8·1 answer
  • What is the solution set of b squared equals 3b?
    12·1 answer
  • Imagine a pet shelter that has noticed older animals (age 5+) have lower adoption rates. This shelter (which has only cats and d
    7·1 answer
  • Jane is a better tennis player than jack. if the probability that jane will beat jack in any given game is 0.7, what is the prob
    8·1 answer
  • State the value of the discriminant of 5x2 + 9x = 3.<br> please answer quick!
    11·1 answer
  • Which classification is given to a function that exhibits symmetry over the origin?
    5·1 answer
  • Find the volume of the cylinder.
    7·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!