Answer:
6 men finish a piece of work in 8 days
1 men finish a piece of work in 8*6 days
4men will finish a piece of work in 48/4
days
..
which is equal to 12 days
Answer:
Step-by-step explanation:
2=27
3=27
5=27
1=126
4=126
Answer:
1.45 m
Step-by-step explanation:
Convert 1.5 metre into cm
1.5 metre =150 center meters
150 cm -5=145
145 into metres is 1.45 m
The number of ways people can get off the elevator is 604800 ways.
In this question,
Number of people, n = 7
Number of floors, r = 10
The first person can leave elevator in one of 10 ways. Then second person has to choose from one of remaining 9 floors. Then third person in 8, fourth in 7 ways and so on.
Number of ways people can get off the elevator can be calculated as
⇒ 
⇒ 
⇒ 
⇒ 
⇒ 
⇒ 604800 ways.
Hence we can conclude that the number of ways people can get off the elevator is 604800 ways.
Learn more about number of ways here
brainly.com/question/27992615
#SPJ4
Q1. Look at the picture.

Q2. Look at the picture.

Q3.
Put the value of x = 2 to the equation 3x + y = 5:

<em>subtract 6 from both sides</em>

Q4.

Substitute (*) to (**):
<em>use distributive property</em>

<em>add 33 to both sides</em>
<em>divide both sides by 11</em>

Put the value of m to (*):


Q5.
w - width
3w - length
24 in - the sum of length and width
The equation:

<em>divide both sides by 4</em>


