Basically its 250 + 16x = 210 + 18x where x = the number of hours doing the job.
Solving, we get 40 = 2x, x =20
The jobs has to be 20 hours long in order for their two painting jobs to be equally priced.
Hope this helped!
Using Pythagoras’ theorem a2 + b2 = c2 you can find out the third (longest) side. (6x6) + (8x8) = 100 (the square root of 100 is 10) so ur final sum is 6+8+10 = 24 mm
You leave at 1 P.M., the wedding ceremony starts at 5 P.M.
This gives you a 4 hour gap, the Wedding is 350 miles away, and you're traveling at 65 miles an hour.
Simply you can use two methods, (65 * 4) to verify if you'd make it or not or (350/65) to ensure how many hours it would take in total.
65 * 4 = 260 | Since this is not 350, we can verify that you'd be late.
350/65 = 5.4 (estimated) | Meaning it'd take about 5.4 hours.
To know how long that is we'd have to convert over.
5.4 = 5 2/5ths, 60 minutes are in an hour. Divide 60 by 5 to get 12, meaning:
1/5ths = 12/60ths, with that said multiply that by 2 to get your answer.
2/5ths = 24/60ths or 24 minutes.
This means you'd take 5 hours and 24 minutes to get there.
Originally we stated that the process would take 4 hours. Subtract:
(5 hours and 24 minutes) - (4 hours) = (1 hour and 24 minutes)
Concluding that you'd be late by an hour and 24 minutes.
I hope this helps, have a great rest of your day! ^ ^
| | Ghostgate | |
Answer:
Neither do I ...
but I have my AP test for AP Human Geography on Tuesday and I'm on Brainly helping people with their work instead of studying, so I have a feeling I'm not going to do very well. : /