1)Time is plotted on the x-axis in seconds
2)Velocity of the object is plotted on the y-axis in meters per second
A) His estimate is incorrect, since he has increased a figure to the amount that each employee would receive.
B) Rounded to the nearest dollar, each employee would receive $ 209.
Since a company has $ 6582 to give out in bonuses, and an amount is to be given out equally to each of the 32 employees, and A) a manager, Jake reasoned that since 32 goes into 64 twice, each employee will get about $ 2000 , to determine if his estimate is correct, and B) determine how much will each employee receive, rounded to the nearest whole dollar, the following calculations must be performed:
A)
- 2000 x 32 = 64000
- 200 x 32 = 6400
Therefore, his estimate is incorrect, since he has increased a figure to the amount that each employee would receive.
B)
Therefore, rounded to the nearest dollar, each employee would receive $ 209.
Learn more about maths in brainly.com/question/8865479
Answer:
Green Material: <u>129.6</u> in³
Brown Material: <u>194.4</u> in³
Step-by-step explanation:
The volume of the bin is 4×18×9 in³ or 648 in³
20% of 648 is 129.6 in³ (brown material)
30% of 648 is 194.4 in³ (green material)
Answer: e. each component be identified by a coding scheme that specifies size, shape, and the type of processing.
Step-by-step explanation:
Group technology is a technique in manufacturing that involves bringing together parts with similar process of manufacturing or function into the same location so that they can all go through the same process. This follows a general saying that problems with similar groups could possibly be solved using a single or similar solution, which could help save time, resources and efforts.
Answer:
the first two are yes the other two are no
Step-by-step explanation:
i just did this on edgenuity