11/3. This is because you multiply the denominator by the mixed number. Than you add the numerator to that. Put that number over the denominator you had in the original problem. Hope this helps!
The unit rate is obtained by dividing the amount of work done by the unit time. In the problem, we are already given the total number of parts manufactured (amount of work done) and the total amount of time to manufacture (7 hours).
Obtaining the unit rate is as simple as dividing 1116 parts by 7 hours, as shown below:
Unit rate = 1116 parts / 7 hours
Unit rate = 159.42857
Therefore the unit rate is approximately 159 parts/h.
"<span>A health maintenance organization (HMO) is a type of managed healthcare system. "
</span>
HMO, confirmed.
Answer:
- 3 3/4 lb salt
- 2 1/3 L water
Step-by-step explanation:
Each group will get 1/8 of the total amount:
salt: (30 lb)/8 = 3 6/8 lb = 3 3/4 lb
water: (20 L)/8 = 2 4/8 L = 2 1/2 L
Each group will get 3 3/4 pounds of salt and 2 1/2 liters of water.