We conclude that, if working at the same rate, to make 374 units, she needs to work for 17 hours.
<h3>
At the same rate, how many hours would she have to work to make 374?</h3>
We know that Mary makes 242 units of something in 11 hours of work, then her rate of work is:
R = (242 units)/(11 hours) = 22 units per hour.
Now, if she wants to make 374 units, then she needs to work for a time T, such that:
(22 units per hour)*T = 374 units.
Solving that linear equation for T, we get:
T = (374 units)/(22 units per hour) = 17 hours
We conclude that, if working at the same rate, to make 374 units, she needs to work for 17 hours.
If you want to learn more about linear equations:
brainly.com/question/1884491
#SPJ1
The correct answer is A) (1,-5)
Further explanation:
Given points are:
A(-8,7)=(x1,y1)
C(7,13)=(x2,y2)
IT is also given that
AB:BC=3:2
Which means that B divides the line segment in 3:2
Here,
m=3
n=2
To find the coordinates of B

The coordinates of point B are (1,-5)
The correct answer is A) (1,-5)
Keywords: Coordinate geometry, mid-point
Learn more about coordinate geometry at:
#learnwithBrainly
Answer:
1/4=slope
-8=y intercept
Step-by-step explanation:
the equation in slope intercept form would be y=1/4x-8
Answer:
The slope of a line is 2/6 because slope also means rise over run (y/x). So the line's slope is 2/6 because it goes up (rises) in the y-direction 2 units and moves to the right (runs) 6 units, from one point to another.
Step-by-step explanation:
Answer:
158.4 degrees.
Step-by-step explanation:
A line is 180 degress in total so subtract 21.6 from 180. Then you get 158.4