1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Aliun [14]
3 years ago
10

The math club sold roses and tulips this year for Valentine’s day. The number of roses sold was 8 more and 4 times the number of

tulips sold. Tulips were sold for $2 each and roses for $5 each. The club made $414.00. How many roses were sold?
Mathematics
1 answer:
kobusy [5.1K]3 years ago
3 0
Answer : 76


Step by Step Explanation:

Substitute for "r" and solve for "t":
5(4t+8) + 2t = 414
22t + 40 = 414
22t = 374
t = 17 (# of tulips sold)
---
r = 4*17+8 = 76 (# of roses sold)
You might be interested in
Graph: g(x)=5cos((\pi )/(2)x-(3\pi )/(2))-2
Tatiana [17]

g(x)=5cos((\pi )/(2)x-(3\pi )/(2))-2

generate by:  Amplitude:5    Period:4

                      Phase shift:(3 to the right)    Vertical shift:-2

x=3,g(x)= 3

x=4,g(x)= -2

x=5,g(x)= -5

x=6,g(x)= -2

x=7,g(x)= 3

the graph is like cos(x)

learn more about trigonometric graphs here:

brainly.com/question/18265536

#SPJ1

3 0
1 year ago
| -18 + 1| absolute value and helppplpllll​
muminat

Answer:

17

Step-by-step explanation:

| -18 + 1|

-18 + 1 = -17

So,

| -17| = 17

This is because if | -a|, then | -a| = a

6 0
3 years ago
Read 2 more answers
A student conducts several random surveys to find out the most preferred lunch option. Each survey was of 60 students. No studen
stira [4]

Answer:

A

C

is the answer

I think soo

5 0
3 years ago
Solve the linear programming problem.
larisa [96]

Answer:

1. Objective function is a maximum at (16,0), Z = 4x+4y = 4(16) + 4(0) = 64

2. Objective function is at a maximum at (5,3), Z=3x+2y=3(5)+2(3)=21

Step-by-step explanation:

1. Maximize: P = 4x +4y

Subject to: 2x + y ≤ 20

x + 2y ≤ 16

x, y ≥ 0

Plot the constraints and the objective function Z, or P=4x+4y)

Push the objective function to the limit permitted by the feasible region to find the maximum.

Answer: Objective function is a maximum at (16,0),

              Z = 4x+4y = 4(16) + 4(0) = 64

2. Maximize P = 3x + 2y

Subject to x + y ≤ 8

2x + y ≤ 13

x ≥ 0, y ≥ 0

Plot the constraints and the objective function Z, or P=3x+2y.

Push the objective function to the limit in the increase + direction permitted by the feasible region to find the maximum intersection.

Answer: Objective function is at a maximum at (5,3),

              Z = 3x+2y = 3(5)+2(3) = 21

7 0
3 years ago
Solve the formula c = 1.06p for p, where c is the cost of an item at Shopping City, including tax, and p is the selling price. (
jek_recluse [69]

Answer:

Step-by-step explanation:

I honestly don't know

4 0
3 years ago
Other questions:
  • (8 2/5 ÷x+3 5/9)÷4 1/6=1 1/3
    15·1 answer
  • Place the indicated product in the proper location on the grid. (3x 2a - 4y az 3a) 2
    11·1 answer
  • Please help me on these using conversion factors. And please include work and tell me which one is greater
    14·1 answer
  • what is the solution to the system of equations? y = –5x 3 y = 1 a). (0.4, 1) b). (0.8, 1) c). (1, 0.4) d). (1, 0.8)
    8·2 answers
  • A
    11·1 answer
  • What is the equation in the slope intercept form of the line that passes through the point (2,-2) and is perpendicular to the li
    8·2 answers
  • Compute the average value of the following function over the region R. f(x,y) = 7 sin x cos y R= { (x,y): 0 leq x leq pi/2, 0 le
    10·1 answer
  • Kendra found two worms in the yard and measured them with a ruler. One worm was 7 2/3 inches long. The other worm was 2 1/6 inch
    12·1 answer
  • Indicate which property is illustrated in step 1
    11·1 answer
  • The estimated velocity v (in miles per hour) of a car at the end of a drag race is v=234\sqrt[3]{p/w} , where p is the horsepowe
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!