1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Kisachek [45]
3 years ago
7

What equation contains the given point ( -3,5)

Mathematics
2 answers:
Alenkasestr [34]3 years ago
6 0

Answer:

y = x + 8

Step-by-step explanation:

attashe74 [19]3 years ago
5 0

Answer:

To determine if a point is on a line you can simply subsitute the x and y coordinates into the equation. Another way to solve the problem would be to graph the line and see if it falls on the line. Plugging in will give which is a true statement, so it is on the line.

Step-by-step explanation:

Off the inter net... sorry

You might be interested in
If the two triangles shown below are similar based on the giveninformation, complete the similarity statement, otherwise choose
SVETLANKA909090 [29]

1) Two triangles are similar if they have congruent angles and proportional sides (for each corresponding leg).

2) So let's check whether there are similar triangles by setting a proportion:

\begin{gathered} \frac{HC}{CA}=\frac{JH}{CB} \\ \frac{9}{18}=\frac{7}{14} \\ Simplify\text{ both:} \\ \frac{1}{2}=\frac{1}{2} \end{gathered}

3) So yes they are similar, i.e. ΔCAB ~ΔHGJ

5 0
1 year ago
Suppose task B follows task A. The likelihood that a problem will occur with task A is 0.5, and the time to correct the problem
jasenka [17]

Answer:

The risk consequence of both activities is 1.6 months.

Step-by-step explanation:

We can define a randome variable D: total delay time for the project, and calculate its expected value.

This would be the risk consequence of both activities.

The expected delay time for the project is the sum of the expected delay for task A plus the expected delay for task B. It is assumed the likelihood of a problem in any task is independent of the other.

Then, each expected delay for a task is equal to the probability of a problem multiplied by the consequence (delay time).

E(D)=E(D_a)+E(D_b)=p_aT_a+p_bT_b\\\\E(D)=0.5*2+0.2*3=1+0.6=1.6

The risk consequence of both activities is 1.6 months.

6 0
3 years ago
<br> help please due in soon
Tamiku [17]

Answer:

The number is called a square or a perfect square number. The next number that comes after 16 is 9 because 3 times 3 is nine.

Step-by-step explanation:

3 0
3 years ago
Order 56.2 56.32 56.321 from greatest you least
frez [133]
Here it is listed from greatest to least:
56.32, 56.321, 56.2
5 0
3 years ago
Read 2 more answers
Maria has added 2 liters of pure water to 8 liters of a 48% sugar syrup. What is the concentration of the resulting solution?
polet [3.4K]
C1V1 = C2V2
0.48×8L = C2(10L)
C2 = (3.84)/10 = 0.384 = 38.4% sugar
4 0
3 years ago
Read 2 more answers
Other questions:
  • 5
    8·1 answer
  • How do i solve for x 30x - 60 = 20x
    5·1 answer
  • Need help understanding this problem please
    11·1 answer
  • Write your answer as a complex number in standard form, I need help please
    7·2 answers
  • Determine the angle at the center of a circle with radius 8.0cm for an arc length of 12.0cm
    11·1 answer
  • How to get the interval?
    15·1 answer
  • Find all the missing elements:
    5·1 answer
  • Y
    9·1 answer
  • Consider the right angle shown below
    6·1 answer
  • <img src="https://tex.z-dn.net/?f=%5Cfrac%7B1%7D%7B2%7D" id="TexFormula1" title="\frac{1}{2}" alt="\frac{1}{2}" align="absmiddle
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!