Answer:
24 hours
Step-by-step explanation:
4 people can do the work in 6 hours
4*6 = 24 work hours
It will take 1 person 24 work hours to complete the job
Answer:
has an area 26,059,203 people that are not in the office
The area of the rectangular garden given the length and width is 16 1/2 square feet
<h3> Area of the garden</h3><h3 />
- Length = 5 1/2 feet
- Width = 3 feet
Area of a rectangular garden = length × width
= 5 1/2 feet × 3 feet
= 11/2 × 3
= 33/2
= 16 1/2 square feet
Learn more about area:
brainly.com/question/8409681
#SPJ1
Possible procedures:
1). peanut, peanut
2). peanut, cashew
3). peanut, pecan
4). cashew, peanut
5). cashew, cashew
6). cashew, pecan
7). pecan, peanut
8). pecan, cashew
9). pecan, pecan.
Nine (9) possible procedures.
But ...
(2) and (4) produce the same final result.
(3) and (7) produce the same final result.
(6) and (8) produce the same final result.
So there are only <em><u>six (6)</u></em> possible different outcomes.
Answer:
The answer is Quotient X: 4/10
3/5 minus 1/5 is 2/5. 4/10 can be simplified to 2/5, which is the answer.