The amount of glue that eric used for his project is
<h3>How to interpret the line plot?</h3>
The interpretation of the line plot involves a careful approach to how a series of data points are connected on coordinate planes.
From the Glue for summer project line plot:
- The greatest estimated amount of glue needed can be seen at = 2 (1/4)
- The actual amount of glue needed = 3/4 of 2 (1/4)
The amount of glue Eric used for the project is;
Therefore, we can conclude that the amount of glue used by Eric for this project is:
Learn more about line plot here:
brainly.com/question/1081562
#SPJ4
<h3>Possible coordinates of R = -5 or 5</h3><h3>Possible coordinates of T = -7 or 7</h3>
==================================================
Explanation:
If we're on a number line, then R could be at either R = 5 or R = -5. This is so the distance from A to R is 5 units. Distance is never negative. You count out the spaces to get the distance, or use subtraction and absolute value.
Saying "distance from A to R is 5" can be written as AR = 5. Meaning segment AR is 5 units long.
Now if AT = 7, then T could be at 7 or -7 on the number line. The reasoning as similar as to why R could be at -5 or 5.
Answer:989.35
42.1×23.5=989.35
I hope this is good enough:
You double it by multiplying by two.