Answer:
boolean
Explanation:
while loops test to see if something is true or false to know when to continue the loop
Answer:
Analyse performance
Explanation:
During the deployment of new services to a certain Platform such as the cloud which is geared towards enhancing scalability which is the ability of platforms to accommodate larger load level are serve an increased number of consumers. These will require these platforms to be Analysed as per performance in other to evaluate them . Through performance analysis, elasticity may need to be tweaked by dynamic rearrangement of the different modules, hardwares in other to ensure that the platform delivers at the required level to serve the increased number of consumers.
Answer:
Bike Frame Flow Time
The value-added percentage of the flow time for this bike frame is:
= 46.
Explanation:
a) Data and Calculations:
Bike Frame Flow Time:
Setup time = 7 hours
Processing time = 6 hours
Storage time = 7 hours
Flow time of the bike frame = 13 hours (7 + 6)
Value-added percentage of the flow time for this bike frame = 6/13 * 100
= 46%
b) Flow time represents the amount of time a bicycle frame spends in the manufacturing process from setup to end. It is called the total processing time. Unless there is one path through the process, the flow time equals the length of the longest process path. The storage time is not included in the flow time since it is not a manufacturing process.
Put a code or security system on or a very secure password
Hope this helps...