Answer:
a) 279 b)254
Step-by-step explanation:
Mean = 269 days
standard deviation = 8 days
let n be the pregnancy lenght.
using normal distribution formula
z = (n – mean)/ standard deviation
n = z * standard deviation + mean
Now, z values for the top 12% has to be found using a z table.
The top 12% means 88% of area under the curve. In this case z = 1,176
n = 1,176 * 8 + 269
n = 278.4 = 279
The bottom 3% means 97% of area under the curve. In this case z = -1,882
n = -1,882 * 8 + 269
n = 253.94 = 254
D= # of dimes
q= # of quarters
QUANTITY EQUATION:
d + q= 64
COST EQUATION:
0.10d + 0.25q= $9.25
STEP 1:
multiply quantity equation by -0.10 to be able to eliminate the d term in step 2
(-0.10)(d + q)= (-0.10)(64)
-0.10d - 0.10q= -6.40
STEP 2:
add equation from step 1 to cost equation to eliminate the d term and solve for q
Add
0.10d + 0.25q= $9.25
-0.10d - 0.10q= -6.40
0.15q= 2.85
divide both sides by 0.15
q= 19 quarters
STEP 3:
substitute q value in step 2 into either original equation to find d value
d + q= 64
d + 19= 64
subtract 19 from both sides
d= 45 dimes
CHECK:
0.10d + 0.25q= $9.25
0.10(45) + 0.25(19)= 9.25
4.50 + 4.75= 9.25
9.25= 9.25
ANSWER: There are 45 dimes and 19 quarters.
Hope this helps! :)
So the first one is 1 square meter of ceiling, and it says 1 square meter of cieling is 10.75. <em>So the first one is just that, 10.75</em>
The second one says 10 square meters, so just multiply 10.75, by 10.
In which case you get <em>107.5.</em> So that's the answer.
Third one, it gives you how many ceiling tiles you have. So you divide the 100 tiles by 10.75, which gives you 9.30232558, which becomes <em>9.3</em>
I'm sure you can figure out the last one.
Answer: 30
Step-by-step explanation:
10 x 3 = 30
It might be wrong but I wanted to try it so don’t you my answer.