Answer:
a. The percentage of vehicles who pass through this construction zone who are exceeding the posted speed limit =90.82%
b. Percentage of vehicles travel through this construction zone with speeds between 50 mph and 55 mph= 2.28%
Step-by-step explanation:
We have to find
a) P(X>40)= 1- P(x=40)
Using the z statistic
Here
x= 40 mph
u= 44mph
σ= 3 mph
z=(40-44)/3=-1.33
From the z-table -1.67 = 0.9082
a) P(X>40)=
Probability exceeding the speed limit = 0.9082 = 90.82%
b) P(50<X<55)
Now
z1 = (50-44)/3 = 2
z2 = (55-44)/3= 3.67
Area for z>3.59 is almost equal to 1
From the z- table we get
P(55 < X < 60) = P((50-44)/3 < z < (55-44)/3)
= P(2 < z < 3.67)
= P(z<3.67) - P(z<2)
= 1 - 0.9772
= 0.0228
or 2.28%
Answer: 17 cm
Step-by-step explanation:
84 - 25(2) = 2x
84 - 50 = 2x
34 = 2x
x = 17
17 cm
Step-by-step explanation:
since it is in the same line as DE, both have the same slope.
the slope is the ratio of "y coordinate change / x coordinate change" when going from one point on the line to another.
and so by using the coordinates of D and E
x changes by +4 (from 8 to 12).
y changes by -8 (from 32 to 24).
the slope is therefore
-8/+4 = -2
You know you have two hours which will be the whole number. Then you take 36min and put it over 60min (total number of min in an hour) and you simplify by 6 to get 6/10 which can be simplified again to 3/5 so your final mixed number is
2 and 3/5 hours